Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Research
    Projects
    Product
    Safety

    Professor Andre van As on cave mining skills: key lessons for project teams

    October 2, 2026|

    Reviewed by Joe Ashwell

    Professor Andre van As on cave mining skills: key lessons for project teams

    First reported on Australian Centre for Geomechanics – News

    30 Second Briefing

    Deep cave mining faces an acute skills crunch as Deloitte projects nearly 50% of mining engineers will reach retirement age within a decade, while Australian accredited undergraduate mining graduates fell from 282 in 2015 to 68 in 2021 and most 2025 graduates now come from master’s programmes with uncertain local retention. Professor Andre van As notes that no top-10 mining school offers a dedicated underground mass mining or cave mining programme, and many academics and SMEs are already at or past typical retirement age. The South Gobi Underground Mass Mining Institute at Oyu Tolgoi, funded initially by Rio Tinto, offers a prototype: expert-taught, site-based cave mining training with professional certification, with AI used to capture and scale retiring specialists’ knowledge rather than replace it.

    Technical Brief

    • Deep cave orebodies cited are typically >1,400 m deep, where caving is often the only viable method.
    • Capital for block and panel caves is committed years before draw response is observable, making design errors effectively irreversible.
    • Deloitte (2026) and McKinsey (2023) data are combined with ANMEE (2026) and Engineers Australia (2024) statistics to quantify specialist shortages.
    • Hebblewhite and Knights (2011) data on academic age distribution (57% over 50; 27% over 55) underpin the ageing-teacher risk assessment.
    • The South Gobi Underground Mass Mining Institute is anchored at the operating Oyu Tolgoi block cave, enabling direct site-based training and observation.
    • SGUMMI’s model integrates classroom theory, mentored field exposure and presenter succession planning, culminating in a Professional Development Certificate.
    • AI tools are proposed to capture tacit cave-mining know‑how from retiring SMEs, structure it, and personalise training content, not to automate design decisions.

    Our Take

    The copper focus and reference to the Oyu Tolgoi block cave mine place this piece within the small subset of our 1265 Mining stories that deal with deep, high-capex underground mass mining, where skills shortages in caving design and geomechanics tend to be most acute.

    The projected shortfall between Australia’s mining engineering graduate supply and the 160–200 engineers per annum demand range suggests operators like Rio Tinto will increasingly lean on global consultancies such as AMC Consultants and OEMs like Sandvik for caving design, automation and training capacity rather than relying solely on in-house teams.

    With nearly half of mining engineers and a high share of Australian mining academics approaching retirement within the next decade, institutes such as Mining Education Australia and the South Gobi Underground Mass Mining Institute are likely to become key vehicles for transferring caving know‑how from projects like Oyu Tolgoi to the next generation before that expertise is lost.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 2 hours ago

    Jiangxi Siton at bauma CHINA 2026: underground fleet takeaways for mine engineers

    Jiangxi Siton is using bauma CHINA 2026 to showcase six underground models, signalling its push beyond China where it already supplies Latin American and Central Asian mines. The company, a key supplier to Jiangxi Copper and other major Chinese mining houses, is positioning its drilling, loading and haulage equipment for both hard rock and coal operations. For engineers, the message is that Chinese OEMs with proven export fleets are now credible alternatives to established Western brands for new underground project tenders and fleet renewals.

    Price floors for rare earth projects beyond China: financing lens for engineers
    Mining
    about 4 hours ago

    Price floors for rare earth projects beyond China: financing lens for engineers

    Western buyers are paying extreme premiums for rare earth oxides as China’s export controls bite, with high‑purity yttrium oxide at about US$1,650/kg in North America versus roughly US$9/kg in China and dysprosium oxide in Europe at about US$4,875/kg, around 22 times the Chinese price. Sprott’s Paul Wong and Jacob White argue that long‑term offtake contracts with price floors, such as MP Materials’ 10‑year US DoD deal at US$110/kg for NdPr and Lynas’ March 2025 floor agreement with JARE, are becoming critical to debt financing new separation and refining capacity. Equity markets remain weak, with the Sprott Rare Earths Ex‑China ETF down 30% since 30 September despite over US$100 million of net inflows, pushing developers towards structured contracts and, in cases like South Africa’s Steenkampskraal, staged lab‑to‑pilot separation trials with partners such as Remedy Metals.

    Kazatomprom bribery probe: operational and project risk notes for mine planners
    Mining
    about 5 hours ago

    Kazatomprom bribery probe: operational and project risk notes for mine planners

    Kazakhstan’s anti-corruption service has detained Kazatomprom operations chief Kuanysh Omarbekov in a widening bribery probe linked to former leaders of sovereign wealth fund Samruk-Kazyna, which controls 63% of the world’s largest uranium miner and managed $88 billion in assets at end-2025. Kazatomprom, whose operations are expected to yield 27,500–29,000 tonnes of uranium in 2026 (14,500–15,500 tonnes attributable), has removed Omarbekov and chief commercial officer Vladislav Baiguzhin, while insisting production and commercial teams remain intact. The investigation comes as Kazatomprom’s global depositary receipts fell nearly 10% in London to $49.80, and as Canadian partner Cameco advances 2026 deliveries from the Inkai mine totalling 10.4 million lb. U3O8.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.