Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Sustainability
    Safety

    Codelco’s Ministro Hales to 2054: design and risk notes for mine engineers

    January 15, 2026|

    Reviewed by Joe Ashwell

    Codelco’s Ministro Hales to 2054: design and risk notes for mine engineers

    First reported on International Mining – News

    30 Second Briefing

    Codelco’s Ministro Hales Division in Chile has secured unanimous approval from Antofagasta’s COEVA for its Future Development EIA, extending mine life from 2026 to 2054 on a planned investment of US$2.8 billion and enabling higher copper production. The long-life plan will require expanded open pit and underground works, new waste and tailings handling capacity, and upgrades to existing concentrator and smelting circuits. Geotechnical and environmental teams now face multi-decade commitments on pit slope stability, tailings stewardship and water management under tighter Chilean regulatory scrutiny.

    Technical Brief

    • Extended operation demands long-term geotechnical monitoring of high walls and dumps under evolving slope-stability criteria.
    • Life extension implies redesign of pit slope angles, berm widths and ramp geometries to maintain safety factors.
    • New waste and tailings capacity will trigger updated dam safety classification, emergency action plans and periodic safety reviews.
    • Higher throughput in concentrator and smelter requires upgraded dust, SO₂ and arsenic capture systems to meet occupational limits.
    • Longer mine life increases cumulative seismic exposure, necessitating robust design for tailings and critical structures under seismic codes.
    • Operational changes must integrate traffic safety management for expanded haulage fleets, including collision-avoidance and fatigue controls.

    Our Take

    In our database of Chilean copper projects targeting 2026 milestones, Codelco already features prominently alongside Collahuasi and Rajo Inca, so a 2026–2054 window for the Ministro Hales Division (DMH) Future Development project signals that Antofagasta Region capacity will remain a backbone of national supply planning rather than a bridging asset.

    The US$2.8 billion investment at Ministro Hales sits against a backdrop of Codelco also committing capital and management bandwidth to lithium via Nova Andino Litio SpA, suggesting internal competition for project execution resources and a likely push to standardise brownfield expansion practices across copper and brine assets.

    Codelco’s recent MoU with Hexagon on collision avoidance and autonomy indicates that the extended life of the Ministro Hales Division gives a long enough runway to justify rolling out higher-level fleet automation and safety systems there, which could materially influence operating cost and safety performance over nearly three decades.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 5 hours ago

    Fluor and WSP on USA Rare Earth’s Round Top: design and risk notes for mine teams

    USA Rare Earth Inc has appointed Fluor Corp and WSP Global Inc as EPCM partners to advance the definitive feasibility study for its Round Top rare earth project in Texas, targeting heavy rare earths and critical magnet materials. The mandate covers process plant, mine infrastructure and associated large-scale infrastructure delivery, drawing on Fluor’s mining and processing design capability and WSP’s experience in complex project execution. For geotechnical and civil teams, early EPCM involvement signals imminent definition of pit design, waste storage, haul roads and water management concepts ahead of permitting and financing.

    Mining
    about 6 hours ago

    CIMIC–Hindustan Zinc tailings recycling project: design notes for mine engineers

    CIMIC Group subsidiaries Sedgman and Leighton Asia have secured separate contracts from Hindustan Zinc Limited to help deliver India’s first zinc tailings recycling facility at the Rampura Agucha Mine in Rajasthan. Sedgman will focus on process plant and tailings treatment infrastructure, while Leighton Asia will provide project delivery and construction services for the brownfield site. The project signals large-scale reprocessing of legacy zinc tailings at one of the world’s largest zinc operations, with implications for paste backfill design, tailings storage stability and metal recovery circuits.

    Argent high-grade silver and peers: exploration takeaways for mine planners
    Mining
    about 15 hours ago

    Argent high-grade silver and peers: exploration takeaways for mine planners

    Exploration activity across Australia this week includes Argent Minerals reporting high-grade silver intercepts at its Kempfield project in New South Wales, with mineralisation extending along strike from existing volcanogenic massive sulphide-style resources. Kalamazoo Resources advanced drilling at its gold targets in the Pilbara and Central Victorian Goldfields, focusing on structurally controlled lodes near historic workings and testing down-dip extensions below old stopes. Adelong Gold continued resource-definition work at the Adelong project in NSW, targeting shear-hosted quartz veins to upgrade JORC classifications and refine pit and underground designs.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.