Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Research
    Product

    UK scientists’ protein membranes for cleaner lithium: DLE implications for mine planners

    October 8, 2026|

    Reviewed by Tom Sullivan

    UK scientists’ protein membranes for cleaner lithium: DLE implications for mine planners

    First reported on MINING.com

    30 Second Briefing

    UK researchers led by the University of Birmingham have secured £6.2 million from the UK’s Advanced Research and Invention Agency to develop protein-based membranes that can selectively separate lithium from sodium for high-purity battery-grade compounds. The three-year project will engineer S‑layer proteins into large-area membranes with uniform, programmable pores, combining AI-guided protein design by Fold9, membrane scale-up and testing by Evove, and high-throughput variant screening by Adaptyv Bio. Success would provide lithium producers with a new DLE route, contingent on achieving industrial-scale durability and consistent separation performance outside the lab.

    Technical Brief

    • S-layer proteins are being re-engineered into 2D lattices forming uniformly sized ion-selective pores.
    • ARIA funding sits within its Universal Fabricators programme, focused on protein-based manufacturing building blocks.
    • Fold9 leads AI-guided protein sequence design to tune pore geometry and ion-binding behaviour.
    • Evove is responsible for membrane fabrication, scale-up and performance testing under realistic brine operating conditions.
    • Adaptyv Bio supplies high-throughput screening, enabling evaluation of thousands of protein variants for Li/Na selectivity.
    • Research methods integrate computational protein design, structural biology, experimental screening, protein production and membrane characterisation.

    Our Take

    The University of Birmingham already features in our database for campus-scale sustainability and life-science infrastructure work, which suggests this lithium and sodium separation research is being embedded in a broader institutional push on low-impact technologies rather than as a stand-alone lab initiative.

    Within the 96 keyword-matched lithium and sodium pieces in our coverage, most focus on brine or hard-rock extraction projects, so a UK-based biology-led route positions this work in a niche space that could appeal to European OEMs seeking lower-footprint, non-brine supply options.

    The £6.2-million ARIA-backed programme in the United Kingdom signals that early-stage bio-based battery-materials processing is starting to attract public innovation capital at a scale comparable to pilot mining projects, which may give UK start-ups like Fold9 and Evove leverage when negotiating future industrial or automotive partnerships.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 2 hours ago

    Jiangxi Siton at bauma CHINA 2026: underground fleet takeaways for mine engineers

    Jiangxi Siton is using bauma CHINA 2026 to showcase six underground models, signalling its push beyond China where it already supplies Latin American and Central Asian mines. The company, a key supplier to Jiangxi Copper and other major Chinese mining houses, is positioning its drilling, loading and haulage equipment for both hard rock and coal operations. For engineers, the message is that Chinese OEMs with proven export fleets are now credible alternatives to established Western brands for new underground project tenders and fleet renewals.

    Price floors for rare earth projects beyond China: financing lens for engineers
    Mining
    about 4 hours ago

    Price floors for rare earth projects beyond China: financing lens for engineers

    Western buyers are paying extreme premiums for rare earth oxides as China’s export controls bite, with high‑purity yttrium oxide at about US$1,650/kg in North America versus roughly US$9/kg in China and dysprosium oxide in Europe at about US$4,875/kg, around 22 times the Chinese price. Sprott’s Paul Wong and Jacob White argue that long‑term offtake contracts with price floors, such as MP Materials’ 10‑year US DoD deal at US$110/kg for NdPr and Lynas’ March 2025 floor agreement with JARE, are becoming critical to debt financing new separation and refining capacity. Equity markets remain weak, with the Sprott Rare Earths Ex‑China ETF down 30% since 30 September despite over US$100 million of net inflows, pushing developers towards structured contracts and, in cases like South Africa’s Steenkampskraal, staged lab‑to‑pilot separation trials with partners such as Remedy Metals.

    Kazatomprom bribery probe: operational and project risk notes for mine planners
    Mining
    about 5 hours ago

    Kazatomprom bribery probe: operational and project risk notes for mine planners

    Kazakhstan’s anti-corruption service has detained Kazatomprom operations chief Kuanysh Omarbekov in a widening bribery probe linked to former leaders of sovereign wealth fund Samruk-Kazyna, which controls 63% of the world’s largest uranium miner and managed $88 billion in assets at end-2025. Kazatomprom, whose operations are expected to yield 27,500–29,000 tonnes of uranium in 2026 (14,500–15,500 tonnes attributable), has removed Omarbekov and chief commercial officer Vladislav Baiguzhin, while insisting production and commercial teams remain intact. The investigation comes as Kazatomprom’s global depositary receipts fell nearly 10% in London to $49.80, and as Canadian partner Cameco advances 2026 deliveries from the Inkai mine totalling 10.4 million lb. U3O8.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.