Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Contract Award

    Tivan central Australia critical minerals hub: flowsheet and logistics lens for engineers

    January 19, 2026|

    Reviewed by Tom Sullivan

    Tivan central Australia critical minerals hub: flowsheet and logistics lens for engineers

    First reported on Australian Mining

    30 Second Briefing

    Tivan Limited has completed acquisition of the Molyhil tungsten–molybdenum project in the Northern Territory, positioning it as a core feed source for its planned central Australian critical minerals hub. The company is integrating Molyhil with its existing Speewah vanadium–titanium–iron project and the TIVAN hydrometallurgical process, which targets higher recoveries from complex ores than conventional roasting–leaching flowsheets. Concentrate from remote mine sites is expected to be trucked to a central processing facility, shifting value-add and permitting focus from multiple pit locations to a single downstream plant.

    Technical Brief

    • Similar hub‑and‑spoke concepts are emerging for critical minerals where deposits are small but high value.

    Our Take

    Tungsten and molybdenum appear in only 18 keyword-matched pieces across our mining coverage, signalling that Tivan Limited is moving into a relatively under-reported but strategically sensitive critical minerals space compared with more crowded lithium or copper project news.

    Positioning the Molyhil tungsten molybdenum project as part of a central Australian critical minerals hub in Australia gives Tivan a potential advantage in accessing federal and Territory-level critical minerals support schemes, which have recently prioritised projects outside the traditional iron ore and coal belts.

    Given this is tagged as an M&A-type move rather than a greenfield announcement, practitioners should expect integration and consolidation issues around existing tungsten/molybdenum assets to be as important as new build decisions in how this hub ultimately performs.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 5 hours ago

    Fluor and WSP on USA Rare Earth’s Round Top: design and risk notes for mine teams

    USA Rare Earth Inc has appointed Fluor Corp and WSP Global Inc as EPCM partners to advance the definitive feasibility study for its Round Top rare earth project in Texas, targeting heavy rare earths and critical magnet materials. The mandate covers process plant, mine infrastructure and associated large-scale infrastructure delivery, drawing on Fluor’s mining and processing design capability and WSP’s experience in complex project execution. For geotechnical and civil teams, early EPCM involvement signals imminent definition of pit design, waste storage, haul roads and water management concepts ahead of permitting and financing.

    Mining
    about 6 hours ago

    CIMIC–Hindustan Zinc tailings recycling project: design notes for mine engineers

    CIMIC Group subsidiaries Sedgman and Leighton Asia have secured separate contracts from Hindustan Zinc Limited to help deliver India’s first zinc tailings recycling facility at the Rampura Agucha Mine in Rajasthan. Sedgman will focus on process plant and tailings treatment infrastructure, while Leighton Asia will provide project delivery and construction services for the brownfield site. The project signals large-scale reprocessing of legacy zinc tailings at one of the world’s largest zinc operations, with implications for paste backfill design, tailings storage stability and metal recovery circuits.

    Argent high-grade silver and peers: exploration takeaways for mine planners
    Mining
    about 15 hours ago

    Argent high-grade silver and peers: exploration takeaways for mine planners

    Exploration activity across Australia this week includes Argent Minerals reporting high-grade silver intercepts at its Kempfield project in New South Wales, with mineralisation extending along strike from existing volcanogenic massive sulphide-style resources. Kalamazoo Resources advanced drilling at its gold targets in the Pilbara and Central Victorian Goldfields, focusing on structurally controlled lodes near historic workings and testing down-dip extensions below old stopes. Adelong Gold continued resource-definition work at the Adelong project in NSW, targeting shear-hosted quartz veins to upgrade JORC classifications and refine pit and underground designs.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.