Geomechanics.io

  • Free Tools
Sign UpLog In
AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Research
    Safety
    Projects

    Raisebore stability in deep caving: key takeaways for mine design engineers

    October 2, 2026|

    Reviewed by Tom Sullivan

    Raisebore stability in deep caving: key takeaways for mine design engineers

    First reported on Australian Centre for Geomechanics – News

    30 Second Briefing

    Raisebore stability assessment for deep caving operations is shifting from standalone empirical tools to integrated workflows that combine mXrap’s Raisebore Stability App (QR and MSUS from RMD data), Rocscience UnWedge and RocTunnel3 kinematic analyses, and calibrated numerical stress–deformation modelling. The approach targets long, deep raises in highly stressed, structurally complex ground, addressing mechanisms such as face unravelling, wedge failure, spalling and time-dependent degradation along the full raise alignment. For practitioners, this means earlier screening of raise locations, more defensible diameter and alignment selection, and clearer definition of support and monitoring requirements.

    Technical Brief

    • mXrap Raisebore Stability App computes QR and MSUS from RMD-based logging, strength testing and stress inputs.
    • Rock mass quality, structure, in situ stress, excavation geometry and time-dependent behaviour are treated as co-governing failure drivers.
    • Empirical tools from McCracken & Stacey (1989) and other case histories are explicitly flagged as unreliable in deep, highly stressed, structurally complex ground.
    • Structural kinematic checks use UnWedge for simplified wedge analysis and RocTunnel3 for 3D block modelling with ATV, scanline and underground mapping data.
    • Numerical models track evolving major and minor principal stresses around proposed raises through multiple mining stages to assess spalling and stress-driven fracturing.
    • Research method integrates rock mass classification, structural interpretation, kinematic analysis, stress evaluation and calibrated numerical modelling into a staged workflow.
    • Design outputs include raise alignment and diameter selection, reaming performance expectations, support specification and targeted monitoring intervals along the raise.

    Our Take

    Tools like mXrap, Rocscience’s RocTunnel3 and UnWedge sit in a small subset of our 2414 research/safety-tagged pieces where numerical modelling is explicitly tied to caving and ground support design, signalling that software-driven geomechanics is becoming standard practice rather than specialist add‑on in Australian underground work.

    The prominence of the Australian Centre for Geomechanics and AusIMM in Melbourne and Perth aligns with our broader Mining coverage, where Australia appears as one of the most frequent jurisdictions for deep underground case studies, giving operators there an unusually dense local knowledge base for caving risk management.

    The heavy referencing of classic works (e.g. Lauffer 1988; Martin et al. 1999) alongside recent conference papers in the 11th AusIMM Underground Operators’ Conference and the Ninth International Symposium on Ground Support suggests practitioners are still calibrating modern numerical tools against empirically derived stability concepts, which can help reconcile conservative design cultures with more aggressive caving layouts.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 2 hours ago

    Jiangxi Siton at bauma CHINA 2026: underground fleet takeaways for mine engineers

    Jiangxi Siton is using bauma CHINA 2026 to showcase six underground models, signalling its push beyond China where it already supplies Latin American and Central Asian mines. The company, a key supplier to Jiangxi Copper and other major Chinese mining houses, is positioning its drilling, loading and haulage equipment for both hard rock and coal operations. For engineers, the message is that Chinese OEMs with proven export fleets are now credible alternatives to established Western brands for new underground project tenders and fleet renewals.

    Price floors for rare earth projects beyond China: financing lens for engineers
    Mining
    about 4 hours ago

    Price floors for rare earth projects beyond China: financing lens for engineers

    Western buyers are paying extreme premiums for rare earth oxides as China’s export controls bite, with high‑purity yttrium oxide at about US$1,650/kg in North America versus roughly US$9/kg in China and dysprosium oxide in Europe at about US$4,875/kg, around 22 times the Chinese price. Sprott’s Paul Wong and Jacob White argue that long‑term offtake contracts with price floors, such as MP Materials’ 10‑year US DoD deal at US$110/kg for NdPr and Lynas’ March 2025 floor agreement with JARE, are becoming critical to debt financing new separation and refining capacity. Equity markets remain weak, with the Sprott Rare Earths Ex‑China ETF down 30% since 30 September despite over US$100 million of net inflows, pushing developers towards structured contracts and, in cases like South Africa’s Steenkampskraal, staged lab‑to‑pilot separation trials with partners such as Remedy Metals.

    Kazatomprom bribery probe: operational and project risk notes for mine planners
    Mining
    about 5 hours ago

    Kazatomprom bribery probe: operational and project risk notes for mine planners

    Kazakhstan’s anti-corruption service has detained Kazatomprom operations chief Kuanysh Omarbekov in a widening bribery probe linked to former leaders of sovereign wealth fund Samruk-Kazyna, which controls 63% of the world’s largest uranium miner and managed $88 billion in assets at end-2025. Kazatomprom, whose operations are expected to yield 27,500–29,000 tonnes of uranium in 2026 (14,500–15,500 tonnes attributable), has removed Omarbekov and chief commercial officer Vladislav Baiguzhin, while insisting production and commercial teams remain intact. The investigation comes as Kazatomprom’s global depositary receipts fell nearly 10% in London to $49.80, and as Canadian partner Cameco advances 2026 deliveries from the Inkai mine totalling 10.4 million lb. U3O8.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.