Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Product
    Research

    Mining Forum: Friedland’s I-ROX comminution push – energy and recovery lens for engineers

    September 29, 2026|

    Reviewed by Joe Ashwell

    Mining Forum: Friedland’s I-ROX comminution push – energy and recovery lens for engineers

    First reported on MINING.com

    30 Second Briefing

    Robert Friedland is pushing to replace conventional SAG and ball mills with I-Pulse’s I-ROX pulsed-power comminution, which stores electricity then releases nanosecond–microsecond bursts to fracture ore internally along mineral boundaries, with projected energy cuts of up to 80% and about 5% higher metal recoveries. A 2,500 m² I-ROX research centre in Toulouse is testing Kamoa-Kakula copper ore and tailings, while I-Pulse has also secured a US$250 million CHIPS Act award for silicon-carbide semiconductors. The same platform underlies G-Pulse drilling, claimed to triple penetration rates and extend bit life sixfold, to be trialled on the Millungera Basin geothermal project in Queensland.

    Technical Brief

    • I-ROX disintegration uses stored electrical energy released in billionth–millionth‑second pulses to generate shock waves.
    • Shock waves preferentially fracture ore along mineral boundaries, aiming to reduce ultrafines versus mechanical grinding.
    • A 2,500 m² I-ROX Toulouse facility, opened January 2025, accommodates large‑scale comminution experiments and demos.
    • Ivanhoe has shipped Kamoa‑Kakula ore and tailings to Toulouse for energy‑use and recovery optimisation trials.
    • Research currently relies on in‑house testing and video evidence; no mine‑scale, independently verified datasets are published yet.
    • I-Pulse’s $250 million CHIPS Act award funds silicon‑carbide semiconductor development, critical for high‑power pulsed systems.
    • G-Pulse applies the same pulsed‑power platform ahead of conventional bits to pre‑weaken hard rock during geothermal drilling.
    • Industrial deployment questions remain unresolved: unit cost, continuous throughput capacity and performance versus full SAG–ball circuits.

    Our Take

    If I-Pulse’s projected 80% grinding energy saving were even partially realised at assets like Kamoa-Kakula, it would compound with existing solar and battery additions highlighted in our 30 MW CrossBoundary Energy coverage, pushing those copper operations further down the cost curve and easing grid-dependence in the DRC.

    The CHIPS Act-linked US$250 million award to I-Pulse ties copper-focused mining tech directly into US semiconductor supply-chain policy, which could make future deployments at Ivanhoe Mines’ assets more attractive to Western financiers seeking low-carbon, secure copper units ahead of the 2040 supply gap Friedland references.

    With Ivanhoe Mines simultaneously expanding high-grade copper resources in the DRC (as in the Makoko District resource uplift in our database) and backing disruptive comminution via I-ROX, the company is positioning to monetise lower-grade envelopes and complex ores that would be marginal under conventional SAG-mill energy and recovery performance.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 2 hours ago

    Jiangxi Siton at bauma CHINA 2026: underground fleet takeaways for mine engineers

    Jiangxi Siton is using bauma CHINA 2026 to showcase six underground models, signalling its push beyond China where it already supplies Latin American and Central Asian mines. The company, a key supplier to Jiangxi Copper and other major Chinese mining houses, is positioning its drilling, loading and haulage equipment for both hard rock and coal operations. For engineers, the message is that Chinese OEMs with proven export fleets are now credible alternatives to established Western brands for new underground project tenders and fleet renewals.

    Price floors for rare earth projects beyond China: financing lens for engineers
    Mining
    about 4 hours ago

    Price floors for rare earth projects beyond China: financing lens for engineers

    Western buyers are paying extreme premiums for rare earth oxides as China’s export controls bite, with high‑purity yttrium oxide at about US$1,650/kg in North America versus roughly US$9/kg in China and dysprosium oxide in Europe at about US$4,875/kg, around 22 times the Chinese price. Sprott’s Paul Wong and Jacob White argue that long‑term offtake contracts with price floors, such as MP Materials’ 10‑year US DoD deal at US$110/kg for NdPr and Lynas’ March 2025 floor agreement with JARE, are becoming critical to debt financing new separation and refining capacity. Equity markets remain weak, with the Sprott Rare Earths Ex‑China ETF down 30% since 30 September despite over US$100 million of net inflows, pushing developers towards structured contracts and, in cases like South Africa’s Steenkampskraal, staged lab‑to‑pilot separation trials with partners such as Remedy Metals.

    Kazatomprom bribery probe: operational and project risk notes for mine planners
    Mining
    about 5 hours ago

    Kazatomprom bribery probe: operational and project risk notes for mine planners

    Kazakhstan’s anti-corruption service has detained Kazatomprom operations chief Kuanysh Omarbekov in a widening bribery probe linked to former leaders of sovereign wealth fund Samruk-Kazyna, which controls 63% of the world’s largest uranium miner and managed $88 billion in assets at end-2025. Kazatomprom, whose operations are expected to yield 27,500–29,000 tonnes of uranium in 2026 (14,500–15,500 tonnes attributable), has removed Omarbekov and chief commercial officer Vladislav Baiguzhin, while insisting production and commercial teams remain intact. The investigation comes as Kazatomprom’s global depositary receipts fell nearly 10% in London to $49.80, and as Canadian partner Cameco advances 2026 deliveries from the Inkai mine totalling 10.4 million lb. U3O8.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.