Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Contract Award

    Maaden’s US$110bn Saudi build-out: project and infrastructure notes for mine planners

    January 16, 2026|

    Reviewed by Joe Ashwell

    Maaden’s US$110bn Saudi build-out: project and infrastructure notes for mine planners

    First reported on MINING.com

    30 Second Briefing

    Maaden will invest US$110 billion over the next decade to triple its phosphate and gold output and double aluminium production, centred on eight megaprojects including the US$22.7 billion Wa’ad Al Shamal phosphate complex and its US$7.7 billion Phosphate 3 expansion due in 2027. Current capacity stands at about 500,000 oz. gold and 7 million tonnes per year of phosphate and aluminium, with phosphate output from Wa’ad Al Shamal and Ras Al Khair alone rated at 6 million tonnes per year. The build-out will drive major new pipelines, ports and rail links in Saudi Arabia and deepen processing partnerships with both MP Materials/US DoD and Chinese firms.

    Technical Brief

    • Wa’ad Al Shamal’s initial capex of US$22.7 billion makes it among the world’s costliest mining complexes.
    • Phosphate 3 at Wa’ad Al Shamal adds a further US$7.7 billion in expansion capital, completion targeted next year.
    • Wa’ad Al Shamal processes ore mainly trucked or conveyed from the Al Khabra phosphate mine in northern Saudi Arabia.
    • Combined nameplate phosphate capacity of Wa’ad Al Shamal and Ras Al Khair is 6 Mtpa, supporting large-scale fertiliser production chains.
    • Maaden drilled four Saudi sites recently, delineating almost 8 million oz. of additional gold resources for future mine development.
    • Aluminium output guidance from the Ras Al Khair smelter complex was 850,000–1,150,000 t for the last reported year.
    • Gold production guidance for 2025 is 475,000–560,000 oz. from seven operating mines distributed across the kingdom.
    • A JV with MP Materials and the US Department of Defense will build a rare earth refinery inside Saudi Arabia, anchoring critical minerals processing capacity.

    Our Take

    The nearly 8 million oz of added gold resources across four Arabian Shield sites in the 2026-01-13 item in our database underpins Maaden’s plan to triple its gold business, suggesting that the current growth targets are backed by recent exploration success rather than purely aspirational guidance.

    The rare earth refinery JV between Maaden, MP Materials and the US Department of War (2025-11-19 entry) indicates that Saudi Arabia is positioning its rare earths and lithium ambitions as part of a US-aligned critical minerals supply chain, which may help de-risk offtake for the planned megaprojects relative to China-centric routes.

    Within our 645 Mining stories, Maaden appears unusually active across multiple commodities (gold, aluminium, phosphate and rare earths), signalling that Saudi Arabia is one of the few jurisdictions trying to build an integrated multi-commodity value chain rather than a single-commodity play, which could change competitive dynamics for regional producers in the Middle East and Asia.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 5 hours ago

    Fluor and WSP on USA Rare Earth’s Round Top: design and risk notes for mine teams

    USA Rare Earth Inc has appointed Fluor Corp and WSP Global Inc as EPCM partners to advance the definitive feasibility study for its Round Top rare earth project in Texas, targeting heavy rare earths and critical magnet materials. The mandate covers process plant, mine infrastructure and associated large-scale infrastructure delivery, drawing on Fluor’s mining and processing design capability and WSP’s experience in complex project execution. For geotechnical and civil teams, early EPCM involvement signals imminent definition of pit design, waste storage, haul roads and water management concepts ahead of permitting and financing.

    Mining
    about 6 hours ago

    CIMIC–Hindustan Zinc tailings recycling project: design notes for mine engineers

    CIMIC Group subsidiaries Sedgman and Leighton Asia have secured separate contracts from Hindustan Zinc Limited to help deliver India’s first zinc tailings recycling facility at the Rampura Agucha Mine in Rajasthan. Sedgman will focus on process plant and tailings treatment infrastructure, while Leighton Asia will provide project delivery and construction services for the brownfield site. The project signals large-scale reprocessing of legacy zinc tailings at one of the world’s largest zinc operations, with implications for paste backfill design, tailings storage stability and metal recovery circuits.

    Argent high-grade silver and peers: exploration takeaways for mine planners
    Mining
    about 15 hours ago

    Argent high-grade silver and peers: exploration takeaways for mine planners

    Exploration activity across Australia this week includes Argent Minerals reporting high-grade silver intercepts at its Kempfield project in New South Wales, with mineralisation extending along strike from existing volcanogenic massive sulphide-style resources. Kalamazoo Resources advanced drilling at its gold targets in the Pilbara and Central Victorian Goldfields, focusing on structurally controlled lodes near historic workings and testing down-dip extensions below old stopes. Adelong Gold continued resource-definition work at the Adelong project in NSW, targeting shear-hosted quartz veins to upgrade JORC classifications and refine pit and underground designs.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.