Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Safety
    Sustainability

    Illicit gold imports to UAE: compliance and supply-chain risks for project teams

    November 12, 2026|

    Reviewed by Tom Sullivan

    Illicit gold imports to UAE: compliance and supply-chain risks for project teams

    First reported on MINING.com

    30 Second Briefing

    At least 591 tonnes of illicit gold worth about $74 billion entered the UAE in 2024, including 453 tonnes from African producers and 137 tonnes from countries under international sanctions, accounting for 42% of the country’s total gold imports, SWISSAID reports. Despite 2023 regulations tightening due diligence, only 2 of 52 reviewed Emirati refineries fully apply the new rules, with most still relying on intermediaries and weak traceability. SWISSAID urges reinstating the UAE on the FATF grey list, tougher and public penalties, stronger customs controls, and full disclosure of mined-gold suppliers, warning Swiss refiners—importing 420 tonnes from the UAE in 2024—of elevated sourcing risks.

    Technical Brief

    • SWISSAID’s assessment draws on 2021–2025 trade data and interviews with over 150 stakeholders.
    • Illicit flows include gold smuggled without traceability and metal sourced from conflict zones such as Russia, Yemen and Sudan.
    • Business-friendly regulation and comparatively weak penalties in the UAE have structurally lowered barriers for high‑risk supply.
    • Only 2 of 52 Emirati refineries reviewed for 2023–2025 production fully implemented the 2023 due‑diligence rules.
    • Many refineries still buy via intermediaries, avoiding mine‑site visits and direct chain‑of‑custody verification.
    • SWISSAID urges reinstating the UAE on the FATF list for strategic AML/CFT deficiencies to force tighter controls.
    • Recommended measures include public, tougher sanctions for non‑compliance and mandatory disclosure of all mined‑gold suppliers.
    • Conflict‑affected regions are not to be boycotted outright; SWISSAID argues robust due diligence can de‑risk legitimate artisanal and small‑scale production.

    Our Take

    With 42% of UAE gold imports in 2024 assessed as illicit, Switzerland’s 400–420 t/y intake from the UAE places European refiners and traders squarely inside the same risk envelope, meaning EU/Swiss due-diligence regimes will likely face pressure to tighten around Emirati-origin bullion rather than only mine-of-origin checks.

    The SWISSAID work here mirrors its role in other ASM-focused pieces in our database, where artisanal gold and coltan supply chains have already forced majors like AngloGold Ashanti and Southern Copper to halt field activities; this suggests that reputational and compliance risk from informal supply is now material not just for African producers but also for downstream hubs such as the UAE and Switzerland.

    For copper and polymetallic project developers like Hudbay’s Copper World in Arizona, the scale of documented illicit gold flows into the UAE signals that financiers and offtakers may increasingly demand integrated ESG and chain-of-custody assurances across all by-product metals, not just the primary copper output.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    BMO sees tax plan lifting early mine cash flow: project economics lens for engineers
    Policy
    about 12 hours ago

    BMO sees tax plan lifting early mine cash flow: project economics lens for engineers

    Canada’s proposed Productivity Mega Deduction would allow miners to immediately expense 100% of qualifying Canadian development costs and eligible equipment acquired after 15 September, with BMO modelling about 30% higher early free cash flow for a new gold mine and roughly 3% first‑year operating cash flow uplift for larger producers. BMO estimates the change would raise a model project’s IRR from 20% to 21% and increase net asset value by 7% versus about 2% for established Canadian operators, assuming provinces follow Ottawa. Alamos Gold’s C$131.7 million Q3 2026 Island Gold shaft, underground works and Magino mill expansion, plus projects at Snowline Gold, Troilus Mining and Osisko Metals, are cited as likely beneficiaries once they generate taxable income.

    GIIA CEO on UK infrastructure risk: policy clarity and pipeline signals for engineers
    Policy
    about 17 hours ago

    GIIA CEO on UK infrastructure risk: policy clarity and pipeline signals for engineers

    UK infrastructure could see capital diverted overseas unless the new government issues clearer long-term policy signals, warns Global Infrastructure Investor Association chief executive Jon Phillips in the latest Engineers Collective podcast. Phillips points to investor concern over recent cancellations and delays to major schemes such as HS2 and road upgrades, and the lack of visibility on the National Infrastructure Commission’s pipeline. For engineers, he flags that stable, 10–20 year commitments on regulated assets, energy transition projects and large transport corridors are now central to securing private finance.

    Carbon Border Adjustment Mechanism: tender‑stage cost risks for UK infrastructure
    Policy
    about 21 hours ago

    Carbon Border Adjustment Mechanism: tender‑stage cost risks for UK infrastructure

    The Carbon Border Adjustment Mechanism will impose a UK carbon tax from January 2027 on imported carbon‑intensive materials such as steel, cement and aluminium, aligning their carbon cost with that paid under the UK Emissions Trading Scheme. Infrastructure projects relying on high‑volume imports of rebar, structural steel sections, clinker or precast components face exposure to additional, project‑specific carbon costs at tender stage. Contractors and designers will need earlier supply‑chain carbon data, alternative material specifications and revised whole‑life carbon and cost models to avoid margin erosion on fixed‑price contracts.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.