Geomechanics.io

  • Free Tools
Sign UpLog In
AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Safety

    Dredge Robotics and mining water assets: maintenance and safety insights for engineers

    January 19, 2026|

    Reviewed by Tom Sullivan

    Dredge Robotics and mining water assets: maintenance and safety insights for engineers

    First reported on Australian Mining

    30 Second Briefing

    Dredge Robotics is deploying remotely operated dredging robots to clean and inspect mining water assets such as tailings ponds, process water dams and clarifiers without draining them or sending divers into confined, low-visibility environments. The systems use high-pressure jetting and suction to remove settled solids while capturing video and sonar data for condition assessment of liners, embankments and submerged structures. For site engineers, this enables maintenance in live ponds, reduces downtime for critical water circuits and provides better geotechnical insight into dam and pond behaviour.

    Technical Brief

    • Remotely operated dredges are launched from shore using crane or davit systems, avoiding personnel on floating plant.
    • Operators control the robotic dredge from a containerised control room, maintaining separation from dam walls and steep batters.
    • High-definition cameras and sonar sensors are integrated into the dredge head for close-range inspection of liners and structures.
    • Solids are pumped via flexible HDPE or rubber-lined hoses to dewatering areas, limiting heavy vehicle access on dam crests.
    • The system’s low-profile tracked chassis is designed to traverse soft, unconsolidated sediments without exceeding allowable bearing pressures.
    • Robotics deployment reduces reliance on commercial diving operations in turbid, confined mining ponds, aligning with stricter site safety rules.
    • Continuous operation in live circuits allows maintenance windows to be scheduled around process constraints rather than full dam outages.
    • Similar robotic approaches could be extended to inspect decant structures and spillways where access scaffolding poses fall hazards.

    Our Take

    Within the 668 Mining stories in our database, very few Australia-focused pieces link water asset maintenance with robotics and AI, so Dredge Robotics is operating in a relatively uncluttered niche compared with more crowded AI themes like fleet optimisation.

    Because this item is tagged to Safety rather than Productivity alone, it aligns with a small subset of AI and artificial intelligence keyword pieces that frame automation as a way to remove personnel from high-risk water and tailings environments, which can materially influence how Australian regulators and site safety committees assess such technologies.

    Prime Creative Media and Australian Mining frequently feature early-stage project technologies; inclusion here signals that Dredge Robotics’ approach is moving from trial status towards broader industry visibility in Australia, which can help contractors justify CAPEX on remote or robotic water maintenance solutions in upcoming project tenders.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 5 hours ago

    Fluor and WSP on USA Rare Earth’s Round Top: design and risk notes for mine teams

    USA Rare Earth Inc has appointed Fluor Corp and WSP Global Inc as EPCM partners to advance the definitive feasibility study for its Round Top rare earth project in Texas, targeting heavy rare earths and critical magnet materials. The mandate covers process plant, mine infrastructure and associated large-scale infrastructure delivery, drawing on Fluor’s mining and processing design capability and WSP’s experience in complex project execution. For geotechnical and civil teams, early EPCM involvement signals imminent definition of pit design, waste storage, haul roads and water management concepts ahead of permitting and financing.

    Mining
    about 6 hours ago

    CIMIC–Hindustan Zinc tailings recycling project: design notes for mine engineers

    CIMIC Group subsidiaries Sedgman and Leighton Asia have secured separate contracts from Hindustan Zinc Limited to help deliver India’s first zinc tailings recycling facility at the Rampura Agucha Mine in Rajasthan. Sedgman will focus on process plant and tailings treatment infrastructure, while Leighton Asia will provide project delivery and construction services for the brownfield site. The project signals large-scale reprocessing of legacy zinc tailings at one of the world’s largest zinc operations, with implications for paste backfill design, tailings storage stability and metal recovery circuits.

    Argent high-grade silver and peers: exploration takeaways for mine planners
    Mining
    about 15 hours ago

    Argent high-grade silver and peers: exploration takeaways for mine planners

    Exploration activity across Australia this week includes Argent Minerals reporting high-grade silver intercepts at its Kempfield project in New South Wales, with mineralisation extending along strike from existing volcanogenic massive sulphide-style resources. Kalamazoo Resources advanced drilling at its gold targets in the Pilbara and Central Victorian Goldfields, focusing on structurally controlled lodes near historic workings and testing down-dip extensions below old stopes. Adelong Gold continued resource-definition work at the Adelong project in NSW, targeting shear-hosted quartz veins to upgrade JORC classifications and refine pit and underground designs.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.