Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Contract Award

    Westgold WA gold project sale: pit design and geotech implications for engineers

    May 20, 2026|

    Reviewed by Joe Ashwell

    Westgold WA gold project sale: pit design and geotech implications for engineers

    First reported on Australian Mining

    30 Second Briefing

    Westgold Resources is divesting its Chalice gold project in Western Australia to Corazon Mining, signalling a tighter capital focus on its core producing assets such as the Meekatharra and Bryah operations. The transaction hands Corazon a brownfields gold project in an established WA mining district with existing drilling data and historic resource work, rather than a greenfields exploration play. For geotechnical and mining teams, the deal points to continued consolidation of non-core gold assets and potential near-term re-evaluation of Chalice’s pit designs, geotech models and processing options under new ownership.

    Technical Brief

    • Transaction structure, consideration type, staged payments and any royalty or clawback terms are not disclosed.
    • No public capex guidance, mine schedule, or production targets for Chalice accompany the sale announcement.
    • Existing drilling, resource estimates and pit shells are referenced generically, with no JORC tonnage or grade quoted.
    • Processing route, plant ownership and whether Chalice ore would be toll-treated or require new plant is unspecified.
    • There is no detail on current mining method assumptions (open pit vs underground) or strip ratio.
    • Geotechnical datasets (logging standards, lab test suites, slope stability analyses) are not described in the release.
    • Environmental approvals status, heritage constraints and any existing permits or licences at Chalice are not mentioned.

    Our Take

    In our database, this Chalice divestment follows Westgold’s earlier sales of Mt Henry–Selene and the planned Reedy spin-out, signalling a deliberate pivot to concentrate capital and management on its core Western Australian hubs rather than dispersed gold assets.

    Corazon Mining’s exposure to scandium, rare earths and uranium in other assets means acquiring a gold project in Western Australia diversifies its commodity mix, which may help smooth cashflow volatility compared with the more development-heavy critical minerals projects in our coverage.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 16 hours ago

    Fortescue Real Zero: 690 MW solar and 650 MWh BESS implications for mine power design

    Construction has commenced on Fortescue’s 690 MW Turner River solar farm in the Pilbara and a 650 MWh BYD-based BESS at Cloudbreak, the final major assets in its Real Zero decarbonisation plan for iron ore operations. The utility-scale PV and storage will feed Fortescue’s integrated Pilbara Energy Connect network, designed to displace large diesel and gas loads across multiple mines. For mine planners and electrical engineers, the build-out signals rapid scaling of high-penetration renewables and grid-forming storage in remote, weak-grid conditions.

    Meiteng’s full-size coal dry separation plant in Mongolia: design notes for mine engineers
    Mining
    about 16 hours ago

    Meiteng’s full-size coal dry separation plant in Mongolia: design notes for mine engineers

    Meiteng Technology’s full-size intelligent coal dry separation plant in Mongolia has run stably since October 2025, using its proprietary DCP Full-Size Coal Dry Separation Dream Plant system under harsh continental climate conditions. The installation applies fully dry, sensor-based coal separation without process water, reducing reliance on traditional dense medium circuits and associated tailings dams. For mine operators in arid or freezing regions, the project signals growing viability of large-scale dry beneficiation where water supply, freezing pipelines and slurry management constrain conventional plants.

    Forrestania–Newington gold acquisition: district-scale planning notes for mine teams
    Mining
    about 22 hours ago

    Forrestania–Newington gold acquisition: district-scale planning notes for mine teams

    Forrestania Resources has agreed to acquire 100 per cent of Midas Minerals’ Newington gold project in Western Australia, securing a package of granted mining and exploration tenements in a historically high-yield gold district. The transaction consolidates Forrestania’s Western Australian gold footprint around Newington, giving it full control over both existing mining leases and surrounding exploration ground. For geologists and mine planners, the deal creates a larger, contiguous tenure position that can support district-scale resource definition and staged development drilling.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.