Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Research
    Projects

    WA gallium powerhouse push: retrofit flowsheet takeaways for process engineers

    June 15, 2026|

    Reviewed by Joe Ashwell

    WA gallium powerhouse push: retrofit flowsheet takeaways for process engineers

    First reported on Australian Mining

    30 Second Briefing

    Western Australia is positioning itself as a gallium processing hub through a Curtin University–Nimy Resources research programme backed by $550,000 from the Minerals Research Institute of Western Australia and co-funding from Nimy and Curtin’s Resources Technology and Critical Minerals Trailblazer. The work targets extraction of gallium as a by-product from existing orebodies, aiming to develop flowsheets that can be retrofitted to current concentrators rather than relying on greenfield plants. For miners and process engineers, the project signals future value-add options for low-concentration gallium streams within established base metal operations.

    Technical Brief

    • Funding package totals $550,000 from MRIWA, supplemented by Nimy Resources and Curtin Trailblazer contributions.

    Our Take

    Curtin University is emerging as a central technical node in Western Australia’s critical minerals push, with our database also showing its recent work on rare earths (with Victory Metals) and lithium–zircon geochronology, which can de‑risk early-stage targeting for gallium-bearing systems.

    Western Australia already dominates much of Australia’s iron ore and broader critical minerals coverage in our database, so positioning it as a gallium source likely means gallium will be pursued as a by-product stream from existing or planned operations rather than as stand‑alone mines.

    The involvement of MRIWA alongside Curtin University signals that gallium in Western Australia is being framed as a sovereign supply and technology-materials issue, which typically helps projects access state-backed research funding and pilot-scale processing support earlier in the development cycle.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Gold price slides on strong dollar: planning implications for mine projects
    Mining
    about 16 hours ago

    Gold price slides on strong dollar: planning implications for mine projects

    Gold prices slipped to a one-week low as spot gold fell 0.4% to $4,271.16/oz in New York and December futures eased 0.3% to $4,306 amid a stronger US dollar and expectations of more hawkish US Federal Reserve rate moves. The dollar hit a two-month high and US 10-year Treasury yields hovered near a 20-year peak, sharply raising the opportunity cost of holding non-yielding bullion. Oil gained about 1% on stalled US–Iran talks over the war, while spot silver dropped 1.8% to $63.29/oz, platinum 0.2% to $1,746.44, and palladium rose 0.5% to $1,266.40.

    OceanaGold Waihi expansion: design, throughput and tailings notes for engineers
    Mining
    about 17 hours ago

    OceanaGold Waihi expansion: design, throughput and tailings notes for engineers

    OceanaGold is weighing a 50% expansion of its Waihi plant to 1.2 Mt/y after Wharekirauponga drilling returned standout intercepts including 6.3 m at 97.2 g/t Au from 481.5 m in the East Graben vein and 8.5 m at 41.5 g/t from 399 m. The move would enable concurrent feed from Martha Underground and Wharekirauponga post‑2032, building on a 2024 plan outlining 1.6 Moz over 15 years and an initial 4.1 Mt reserve at 9.2 g/t. Underground development is advancing, with the Waihi North decline now 350 m, first vent shaft under construction, staged commissioning of a new water treatment plant, and early works on a new tailings storage facility due in Q4.

    Kinross Gold output cut and higher AISC: operational drivers and FCF lens for mine teams
    Mining
    about 17 hours ago

    Kinross Gold output cut and higher AISC: operational drivers and FCF lens for mine teams

    Kinross Gold has cut its 2026–27 production outlook by about 8% to 1.84–1.86 million attributable gold-equivalent oz. a year and raised 2024 AISC guidance to $1,850–$1,900/oz after winter storms, copper-rich sulphide ore and poor recoveries at La Coipa in Chile, plus weaker mining rates, grades and recoveries at Round Mountain Phase S in Nevada. The company is stockpiling high-copper material, studying a new flotation circuit for deeper sulphide mineralisation that may overlie a copper porphyry system, and using a smaller shovel at Round Mountain to cut dilution. Despite the operational hit and a Q3 output cut to about 425,000 oz., Kinross has lifted its 2026 shareholder return target to 50% of free cash flow and has already returned about $800 million this year, mainly via $655 million in buybacks.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.