Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Contract Award

    US widens lead over Europe in critical minerals race: WSJ: key insights for engineers

    July 17, 2026|

    Reviewed by Joe Ashwell

    US widens lead over Europe in critical minerals race: WSJ: key insights for engineers

    First reported on MINING.com

    30 Second Briefing

    Washington has committed about $46 billion in grants, loans and tax incentives to critical raw materials projects over five years, roughly eight times EU support, and is tying this to preferential access deals in the DRC, Ukraine and other jurisdictions. London-based Pensana has moved its Longonjo rare earth processing plant from Britain to the US to pursue Export-Import Bank financing, while Brazil’s Serra Verde secured US-backed funding tied to long-term magnetic rare earth offtake. The EU is scrambling to respond with a €3‑billion financing hub, strategic stockpiles and a 2030 target that no single supplier exceed 65% of any strategic raw material.

    Technical Brief

    • US-backed overseas deals include preferential access arrangements in the Democratic Republic of Congo and Ukraine.
    • EU response includes formal partnerships with Canada, Argentina, Norway and South Africa for diversified strategic raw material supply.

    Our Take

    Serra Verde’s role in this piece links directly to the separate USA Rare Earth–Serra Verde deal now under antitrust review in Brazil, signalling that Brazilian rare earth assets like the Pela Ema mine are becoming a strategic hinge between US-backed financing and EU diversification aims.

    Within our recent critical minerals policy stories, lithium and rare earth projects in Brazil, Argentina and Africa feature disproportionately, suggesting that assets such as Longonjo and Sigma Lithium’s operations are likely to see sustained competition between US, EU and Chinese-backed financiers rather than relying on a single bloc.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    US Department of Energy $65.5M oil and gas push: infrastructure and digital twin lens
    Policy
    1 day ago

    US Department of Energy $65.5M oil and gas push: infrastructure and digital twin lens

    US Department of Energy is offering up to $65.5 million in cost-shared funding for projects that convert stranded, flared or contaminant-limited oil and gas streams into high-value, transportable products and field-test modular gas conversion and sour gas processing units in active basins. Additional funding targets advanced materials and equipment—compressors, valves, piping, storage tanks, coatings and alloys—to cut product losses and harden midstream infrastructure. A third track backs digital twins, continuous monitoring and full-scale smart test sites to optimise upstream and midstream operations, building on a separate $150 million programme for unconventional reservoirs and hydraulic fracture characterisation.

    Nista’s 2025–26 Major Projects report: planning constraints and delivery lessons for engineers
    Policy
    3 days ago

    Nista’s 2025–26 Major Projects report: planning constraints and delivery lessons for engineers

    Nista’s second Major Projects Annual Report, covering 1 April 2025 to 31 March 2026, reports improving delivery confidence on parts of the £700bn-plus National Infrastructure and Construction Pipeline but flags persistent schedule and cost risks on complex rail, energy and digital schemes. The authority backs tighter portfolio management, earlier constructability input and stronger use of digital twins and alliancing contracts, yet stops short of calling for statutory planning reform or changes to Development Consent Order processes. For engineers, the message is to plan for prolonged consenting and stakeholder engagement as a fixed constraint rather than a variable.

    Crucitas revival in Costa Rica: policy, royalties and ESG risks for mine planners
    Policy
    4 days ago

    Crucitas revival in Costa Rica: policy, royalties and ESG risks for mine planners

    Costa Rica’s President Laura Fernández is pushing Bill 24.717 to reopen the Crucitas gold deposit by allowing metallic mining only within the 84,800-hectare Cutris de San Carlos district, while keeping the national open-pit metal mining ban elsewhere. The bill proposes public auctions run by the Directorate of Geology and Mines, minimum 5% gross-sales royalties and strict technical, financial and environmental pre-qualification, aiming to displace mercury- and cyanide-based illegal mining. Analysts warn that investor interest will hinge less on Crucitas’ mid-sized geology and more on territorial control, gold traceability and long-term ESG and legal stability.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.