Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Op-Ed
    Sustainability

    US scrap rules: processing bottlenecks and security ratio for engineers

    August 23, 2026|

    Reviewed by Tom Sullivan

    US scrap rules: processing bottlenecks and security ratio for engineers

    First reported on MINING.com

    30 Second Briefing

    US export restrictions taking effect later in August will force some lithium-ion battery scrap, including black mass, and tungsten scrap to be sold to US buyers, but GEM Mining Consulting’s Alina Karpunina argues supply security hinges on how much of this material is actually converted into qualified secondary minerals. DOE data show a 2023 US mismatch, with intermediate facilities able to process nearly 175,000 tons of batteries and scrap, but only about 35,500 tons of battery-material recovery capacity and 76,000 tons more merely planned. Karpunina proposes a “scrap-to-security conversion ratio” based on contained critical-mineral units recovered to customer specification, warning that export controls without robust domestic processing risk idle feedstock and continued reliance on primary mining.

    Technical Brief

    • GEM’s “recoverable strategic supply” framework requires scrap to clear five hurdles from availability to qualification.
    • GEM’s proposed “scrap-to-security conversion ratio” uses contained critical-mineral units meeting spec divided by retained units.
    • Lack of harmonised US datasets tracking metal-content flows through collection, pre-treatment, recovery and qualification blocks ratio calculation.

    Our Take

    The 68% ‘scrap-to-security’ conversion ratio used here mirrors GEM Mining Consulting’s separate finding that only around two‑thirds of headline lithium supply is truly usable to 2035, underlining that processing losses and off‑spec output are now a systemic constraint across critical minerals rather than a niche recycling issue.

    In another recent GEM policy piece on processing bottlenecks, sulphuric acid supply and plant throughput – not ore – were flagged as likely triggers of the next supply shock for copper, nickel and graphite; the US rules on lithium‑ion battery scrap and tungsten scrap therefore risk tightening an already fragile mid‑stream for these same commodities if domestic plants underperform.

    Within our 127 Policy stories, relatively few focus on tungsten compared with lithium and copper, so the note that US tungsten mining ceased in 2015 while seven domestic processors remain suggests future US security-of-supply debates may pivot from new mines to securing long‑term scrap and concentrate feed for this small group of converters.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Smarter risk-sharing for UK ageing infrastructure: key lessons for project engineers
    Policy
    2 days ago

    Smarter risk-sharing for UK ageing infrastructure: key lessons for project engineers

    Improved public–private collaboration, “smarter” financial risk sharing and better asset data are being urged by a new Lloyds Banking Group report to upgrade the UK’s ageing, climate-exposed infrastructure. The report calls for clearer allocation of construction, demand and climate risks between government, institutional investors and asset owners, moving beyond traditional PFI-style models. For engineers, this points to stronger requirements for whole-life performance data, climate stress testing of assets and more transparent condition information to unlock private capital for renewals and resilience upgrades.

    Government’s 10% biodiversity net gain ceiling: key planning risks for engineers
    Policy
    2 days ago

    Government’s 10% biodiversity net gain ceiling: key planning risks for engineers

    Environmental charity the Environmental Law Foundation has warned it may launch a judicial review against the government’s new biodiversity net gain (BNG) regime, arguing that the statutory 10% uplift risks being treated as a de facto cap rather than a minimum. The challenge would focus on how planning authorities apply the Environment Act 2021 BNG provisions and Natural England’s statutory metric in development consents. For civil and geotechnical schemes, this could affect habitat creation areas, earthworks footprints and off-site BNG land agreements already being negotiated.

    Carbon in procurement: practical tender implications for project engineers
    Policy
    3 days ago

    Carbon in procurement: practical tender implications for project engineers

    Carbon-focused procurement is emerging as a practical lever for low-carbon infrastructure, with clients increasingly writing embodied and whole-life carbon limits directly into tender documents alongside cost and programme. Contracting authorities are starting to require Environmental Product Declarations, PAS 2080-aligned carbon management plans and optioneering that compares low-clinker cements, recycled steel and alternative pavement designs on a carbon-per-functional-unit basis. For engineers and contractors, this shifts bid strategy towards quantifiable carbon performance, verifiable data and early supplier engagement rather than purely lowest capital cost.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.