Geomechanics.io

  • Free Tools
Sign UpLog In
AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Research
    Safety

    Solids flow basics: two-phase design lessons for bulk handling engineers

    September 2, 2026|

    Reviewed by Joe Ashwell

    Solids flow basics: two-phase design lessons for bulk handling engineers

    First reported on Australian Mining

    30 Second Briefing

    Two-phase flow between solid particles and interstitial air is shown to control how powders settle, discharge and move through hoppers, chutes and transfer points, with air pressure gradients often dominating behaviour in fine or aeratable materials. Jenike & Johanson’s microlearning session explains how phenomena such as flooding, ratholing and erratic discharge arise when air cannot escape freely, and why conventional single-phase flow assumptions fail. The content points engineers towards incorporating air permeation, deaeration and venting design into bulk solids handling calculations and equipment selection.

    Technical Brief

    • Conceptual models distinguish between coarse, fine and aeratable powders with differing air–permeation behaviours.
    • Safety emphasis is on preventing uncontrolled powder surges, blockages and unexpected flow stoppages during operation.
    • Guidance includes designing air escape paths, venting and deaeration features as explicit safety measures.
    • Training is framed as foundational knowledge for hazard analysis in bulk solids handling systems.
    • Scope is introductory; it outlines mechanisms and design levers but does not present new experimental data.

    Our Take

    Jenike & Johansen’s focus on solids flow fundamentals complements other Australian Mining coverage on dust and emissions control (for example the Nederman MikroPul piece), signalling that bulk material handling risks are being treated more holistically from chute design through to air quality management.

    For Australian operations moving towards more automated and AI-enabled plants (as highlighted in the recent digital ecosystems article involving Australian Mining), reliable solids flow behaviour is a prerequisite; poor hopper and transfer design can undermine the performance of otherwise sophisticated control systems.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    CREST Hub for critical minerals: separation and flowsheet insights for engineers
    Materials
    3 days ago

    CREST Hub for critical minerals: separation and flowsheet insights for engineers

    A new ARC Research Hub for Critical Energy Separation Materials (CREST Hub), led by Monash University, will develop separation technologies to recover critical minerals from complex ores and waste streams, improve lithium production and cut emissions from materials processing. The national hub links five Australian universities with six industry partners to focus on advanced sorbents, membranes and process-intensification approaches for energy‑efficient separations. Outcomes are expected to target low‑grade and refractory deposits, tailings reprocessing and lower‑carbon flowsheets for battery‑material supply chains.

    Niron Magnetics’ $1.8bn Alabama plant: supply chain and design notes for engineers
    Materials
    5 days ago

    Niron Magnetics’ $1.8bn Alabama plant: supply chain and design notes for engineers

    Niron Magnetics will build a $1.8 billion, 1.6-million-square-foot advanced manufacturing campus at the Westgate Super Site in Dothan, Alabama, centred on a 10,000-ton high-volume plant producing rare-earth-free iron nitride permanent magnets. The facility, Niron’s second after a 1,500‑ton‑per‑year plant scheduled for 2027 in Sartell, is expected to add 700 high-wage jobs within five years and use abundant domestic iron and nitrogen feedstocks instead of neodymium. The project, backed by a separate $150 million, 20‑year US defence loan for Minnesota, signals a shift towards geographically diversified, rare-earth-free magnet supply for automotive, defence and AI infrastructure.

    Ecocem’s ACT at Westminster retrofit: low‑carbon concrete lessons for engineers
    Materials
    7 days ago

    Ecocem’s ACT at Westminster retrofit: low‑carbon concrete lessons for engineers

    Ecocem’s ACT low-carbon concrete, which can cut cement-related CO₂ by up to 70% and is compatible with standard batching and placement methods, has been specified by Sisk for the TP Bennett-designed retrofit of the former John Lewis HQ at 171 Victoria Street, Westminster. The scheme will deliver over 200,000 sq ft of Grade A workspace while retaining existing steelwork, concrete and around 500 stainless-steel window frames and glazed units in line with Westminster’s retrofit-first policy. ACT has already been proven on more than 40 European projects, including 9,000m³ at Chessy, France, and is backed by Ecocem’s €220m scale-up programme and a dedicated Dunkirk plant due online in 2027.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.