Geomechanics.io

  • Free Tools
Sign UpLog In
AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Safety

    Sahel miners on their own: security and logistics takeaways for project teams

    July 15, 2026|

    Reviewed by Joe Ashwell

    Sahel miners on their own: security and logistics takeaways for project teams

    First reported on MINING.com

    30 Second Briefing

    Russia’s Africa Corps replacing French forces in Mali has failed to contain jihadist group JNIM, which has expelled Russian troops from Kidal and assassinated Mali’s defence minister, leaving Western miners such as Barrick operating in an increasingly unstable Sahel. Security risk analyst George McLeod says Barrick’s Loulo-Gounkoto complex near the Senegal border is currently shielded from most attacks but is preparing for insurgent movement south, relying on a local contractor, AMM, with several hundred guards. With a weakened Bamako junta and no state infrastructure support, major mines may evolve into quasi-autonomous enclaves, importing supplies via Senegal and running self-contained security and logistics.

    Technical Brief

    • JNIM employs combined drone–motorcycle “swarm” tactics, complicating perimeter defence and convoy protection planning.
    • Drones were initially used for ISR and propaganda filming pre‑2018, then adapted as improvised bomb carriers.
    • JNIM finances operations via extortion, kidnapping and seizure of state assets, elevating kidnap-for-ransom exposure for mine staff.
    • Barrick’s Loulo‑Gounkoto site security is outsourced to local contractor AMM, fielding at least several hundred guards.
    • AMM is described as “murky”, indicating opaque command, training standards and accountability for use‑of‑force incidents.
    • JNIM embeds in rural schools and madrasas, enabling long‑term control of access roads and village‑level supply chains.
    • With the Malian state providing negligible infrastructure or protection, mines must design fully self‑reliant security, fuel and logistics systems.

    Our Take

    In our database of 2424 safety- and project-tagged pieces, the Sahel (Mali, Niger, Burkina Faso) appears far less frequently than established gold hubs like Ontario or Western Australia, which signals that many operators and consultants still have limited comparative data when benchmarking security strategies for assets such as Barrick’s Loulo-Gounkoto complex.

    Because the Sahel is a significant source of gold and prospective for uranium, cobalt and copper, heightened exposure to groups like JNIM and ISIS effectively tightens the risk premium on future supply from this region, which can make lower-risk jurisdictions like Western Australia’s rare earths projects (e.g. Browns Range in recent coverage) relatively more attractive for long-term critical minerals investment.

    The reference to Russia-linked formations such as Africa Corps alongside Sahel states like Mali and Niger suggests that security arrangements around mining assets are becoming more fragmented and bilateral, so operators cannot assume the kind of integrated state–company security frameworks seen in Canadian or Australian gold projects highlighted elsewhere in our coverage.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 7 hours ago

    Glencore’s US$250m Cat order for Alumbrera: fleet renewal lens for mine planners

    Glencore has placed a US$250 million order with Finning’s South America business to supply more than 20 large Caterpillar mining trucks, ancillary equipment and technology support for the planned 2026 restart of the Alumbrera copper mine in Argentina. The package, disclosed in Finning’s Q1 2026 results, centres on fleet renewal and digital support rather than life-extension of legacy units. For mine planners and maintenance teams, the scale and timing signal a shift towards a modernised, OEM-supported truck fleet ahead of full production ramp-up.

    MAX Power’s Lawson hydrogen project expansion: scale and infrastructure lens for engineers
    Mining
    1 day ago

    MAX Power’s Lawson hydrogen project expansion: scale and infrastructure lens for engineers

    MAX Power Mining has secured an additional 155,125 acres (628 sq. km) of permits contiguous with its 1,224 sq. km Lawson natural hydrogen project in south-central Saskatchewan, creating the newly named Aurora project on a basement-controlled structural play along the Paleoproterozoic–Archean contact of the Sask Craton. The company has now accumulated 660,263 acres (2,672 sq. km) of provincial permits across the Genesis Trend while running a multi-well commercial validation drill programme at Lawson targeting large-scale natural hydrogen. An MOU with the City of Moose Jaw links potential hydrogen development to a nearby heavy industrial and major data centre corridor, signalling early focus on local offtake and infrastructure integration.

    American Mineral Resources’ diversified portfolio: capex and jurisdiction risk lens
    Mining
    1 day ago

    American Mineral Resources’ diversified portfolio: capex and jurisdiction risk lens

    American Mineral Resources is assembling a seven-jurisdiction portfolio across Quebec, British Columbia, Yukon, Chile, New Zealand, Western Australia and Tanzania, with its Piscau North polymetallic project in Quebec earmarked for a separate Canadian Securities Exchange listing, as it targets a Nasdaq uplist within 12 months via the OTCQB. CEO Ryan Cunningham is prioritising projects with existing permits or modest capex and argues that jurisdictional risk now rivals grade, citing Quebec’s Gaspé oil drilling ban as a warning. He also points to Canada’s flow-through share regime as a key financing advantage over US markets still fixated on AI and tech.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.