Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Product

    OreNova’s AI DFS tools for Horizon Gold: schedule and capex lens for engineers

    September 22, 2026|

    Reviewed by Joe Ashwell

    First reported on International Mining – News

    30 Second Briefing

    OreNova Engineering is deploying proprietary AI-based design tools to accelerate the definitive feasibility study for Horizon Gold’s Gum Creek project in Western Australia, targeting faster engineering of the mineral processing plant. The Perth-based firm is using automated process modelling and plant layout optimisation to compress design cycles that traditionally take months into weeks, while iterating multiple comminution and gold recovery flowsheets. For project engineers, this points to shorter DFS schedules, earlier capex definition and the ability to rapidly compare alternative plant configurations under varying throughput and ore characteristics.

    Technical Brief

    • OreNova’s proprietary AI tools are being applied specifically to Gum Creek’s mineral processing plant engineering.
    • Gum Creek, in Western Australia, is being positioned as a potential major new gold operation.
    • OreNova Engineering is Perth-based, enabling close interaction with Horizon Gold’s local study team.
    • AI workflows are being integrated with conventional process engineering rather than replacing standard design checks.
    • Horizon Gold gains in-house optionality to test multiple process plant concepts without full manual redesign.
    • For similar Australian gold projects, such tools could materially compress front-end engineering and design resourcing.

    Our Take

    OreNova Engineering already features in our database for AI-based compression of mineral processing plant engineering schedules (9 March 2026 item), so its deployment at Horizon Gold’s Gum Creek project signals that these tools are moving from development into live project workflows in Western Australia.

    Among gold-tagged mining pieces in our coverage, relatively few explicitly reference AI or artificial intelligence, suggesting Gum Creek could become an early test case for whether AI-driven design materially shortens DFS timelines for mid-tier Australian gold developers.

    With both OreNova and Horizon Gold based in the Perth/Western Australia corridor, this collaboration underscores how much of the early applied AI work in our mining project coverage is clustering around local engineering consultancies rather than global EPCMs, which may influence who smaller gold operators turn to for DFS support.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Gold price slides on strong dollar: planning implications for mine projects
    Mining
    about 15 hours ago

    Gold price slides on strong dollar: planning implications for mine projects

    Gold prices slipped to a one-week low as spot gold fell 0.4% to $4,271.16/oz in New York and December futures eased 0.3% to $4,306 amid a stronger US dollar and expectations of more hawkish US Federal Reserve rate moves. The dollar hit a two-month high and US 10-year Treasury yields hovered near a 20-year peak, sharply raising the opportunity cost of holding non-yielding bullion. Oil gained about 1% on stalled US–Iran talks over the war, while spot silver dropped 1.8% to $63.29/oz, platinum 0.2% to $1,746.44, and palladium rose 0.5% to $1,266.40.

    OceanaGold Waihi expansion: design, throughput and tailings notes for engineers
    Mining
    about 16 hours ago

    OceanaGold Waihi expansion: design, throughput and tailings notes for engineers

    OceanaGold is weighing a 50% expansion of its Waihi plant to 1.2 Mt/y after Wharekirauponga drilling returned standout intercepts including 6.3 m at 97.2 g/t Au from 481.5 m in the East Graben vein and 8.5 m at 41.5 g/t from 399 m. The move would enable concurrent feed from Martha Underground and Wharekirauponga post‑2032, building on a 2024 plan outlining 1.6 Moz over 15 years and an initial 4.1 Mt reserve at 9.2 g/t. Underground development is advancing, with the Waihi North decline now 350 m, first vent shaft under construction, staged commissioning of a new water treatment plant, and early works on a new tailings storage facility due in Q4.

    Kinross Gold output cut and higher AISC: operational drivers and FCF lens for mine teams
    Mining
    about 16 hours ago

    Kinross Gold output cut and higher AISC: operational drivers and FCF lens for mine teams

    Kinross Gold has cut its 2026–27 production outlook by about 8% to 1.84–1.86 million attributable gold-equivalent oz. a year and raised 2024 AISC guidance to $1,850–$1,900/oz after winter storms, copper-rich sulphide ore and poor recoveries at La Coipa in Chile, plus weaker mining rates, grades and recoveries at Round Mountain Phase S in Nevada. The company is stockpiling high-copper material, studying a new flotation circuit for deeper sulphide mineralisation that may overlie a copper porphyry system, and using a smaller shovel at Round Mountain to cut dilution. Despite the operational hit and a Q3 output cut to about 425,000 oz., Kinross has lifted its 2026 shareholder return target to 50% of free cash flow and has already returned about $800 million this year, mainly via $655 million in buybacks.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.