Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Ofgem backs 16 long-duration storage projects: revenue signals for grid engineers

    June 29, 2026|

    Reviewed by Tom Sullivan

    Ofgem backs 16 long-duration storage projects: revenue signals for grid engineers

    First reported on The Construction Index

    30 Second Briefing

    Ofgem has named 16 long-duration energy storage schemes it is minded to support under its cap-and-floor regime, triggering a public consultation on the proposals. The projects would provide 7,465 MW of storage capacity, targeting multi-hour discharge durations to support system balancing and security of supply. Developers and network planners now have a clearer signal on potential revenue stabilisation for large-scale assets such as pumped hydro and grid-scale batteries, with implications for connection planning and reinforcement strategies.

    Technical Brief

    • Revenue floors reduce downside risk for capital-intensive assets like pumped hydro with long construction periods.
    • Caps limit upside returns, constraining tariff impacts on consumers while still enabling project financeability.
    • Consultation phase allows developers to challenge or refine proposed cap and floor levels and eligibility criteria.
    • Grid planners gain earlier visibility of candidate storage locations, aiding coordinated reinforcement and connection sequencing.
    • Bankability of underground or remote storage schemes improves where network access charges are volatile or uncertain.
    • For geotechnical-heavy schemes (e.g. pumped storage caverns), revenue stabilisation can justify higher upfront investigation spend.

    Our Take

    OFGEM’s move to support 16 storage projects sits alongside the RIIO-3 framework approved in December 2025, which in our coverage enables up to £90bn of network investment; together these signals suggest the regulator is trying to align flexible capacity build-out with major grid reinforcement rather than treating them as separate tracks.

    The UK Government’s 2026 reform programme for Ofgem, highlighted in our database, is explicitly about modernising the regulator for rapid grid-scale renewables and storage, so developers on these 16 projects should expect evolving oversight and reporting requirements over the life of their assets.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    US Department of Energy $65.5M oil and gas push: infrastructure and digital twin lens
    Policy
    1 day ago

    US Department of Energy $65.5M oil and gas push: infrastructure and digital twin lens

    US Department of Energy is offering up to $65.5 million in cost-shared funding for projects that convert stranded, flared or contaminant-limited oil and gas streams into high-value, transportable products and field-test modular gas conversion and sour gas processing units in active basins. Additional funding targets advanced materials and equipment—compressors, valves, piping, storage tanks, coatings and alloys—to cut product losses and harden midstream infrastructure. A third track backs digital twins, continuous monitoring and full-scale smart test sites to optimise upstream and midstream operations, building on a separate $150 million programme for unconventional reservoirs and hydraulic fracture characterisation.

    Nista’s 2025–26 Major Projects report: planning constraints and delivery lessons for engineers
    Policy
    3 days ago

    Nista’s 2025–26 Major Projects report: planning constraints and delivery lessons for engineers

    Nista’s second Major Projects Annual Report, covering 1 April 2025 to 31 March 2026, reports improving delivery confidence on parts of the £700bn-plus National Infrastructure and Construction Pipeline but flags persistent schedule and cost risks on complex rail, energy and digital schemes. The authority backs tighter portfolio management, earlier constructability input and stronger use of digital twins and alliancing contracts, yet stops short of calling for statutory planning reform or changes to Development Consent Order processes. For engineers, the message is to plan for prolonged consenting and stakeholder engagement as a fixed constraint rather than a variable.

    Crucitas revival in Costa Rica: policy, royalties and ESG risks for mine planners
    Policy
    4 days ago

    Crucitas revival in Costa Rica: policy, royalties and ESG risks for mine planners

    Costa Rica’s President Laura Fernández is pushing Bill 24.717 to reopen the Crucitas gold deposit by allowing metallic mining only within the 84,800-hectare Cutris de San Carlos district, while keeping the national open-pit metal mining ban elsewhere. The bill proposes public auctions run by the Directorate of Geology and Mines, minimum 5% gross-sales royalties and strict technical, financial and environmental pre-qualification, aiming to displace mercury- and cyanide-based illegal mining. Analysts warn that investor interest will hinge less on Crucitas’ mid-sized geology and more on territorial control, gold traceability and long-term ESG and legal stability.

    Related Industries & Products

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy