Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Contract Award

    Nolans rare earths project: supply, processing and contract notes for mine planners

    May 22, 2026|

    Reviewed by Joe Ashwell

    Nolans rare earths project: supply, processing and contract notes for mine planners

    First reported on Australian Mining

    30 Second Briefing

    Arafura Rare Earths has approved construction of the Nolans rare earths project, 135km north of Alice Springs in the Northern Territory, after more than 20 years of exploration and feasibility work. Backed by federal funding and offtake support from international customers including Hyundai and Kia, Nolans is designed as an integrated mine and processing plant producing neodymium-praseodymium (NdPr) oxide for permanent magnets. The project strengthens non-Chinese supply options for magnet rare earths, with implications for long-term contracts, processing technology selection and downstream value-adding in Australia.

    Technical Brief

    • For other Australian mining projects, Nolans’ integrated flowsheet signals a shift towards local downstream processing.

    Our Take

    The recent final investment decision on the Nolans rare earths project, noted in our 21 May coverage, means this contract award phase is occurring with funding and execution risk already partly de‑risked, which typically sharpens pricing and competition among EPC and mining services bidders in the Northern Territory.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 15 hours ago

    Fortescue Real Zero: 690 MW solar and 650 MWh BESS implications for mine power design

    Construction has commenced on Fortescue’s 690 MW Turner River solar farm in the Pilbara and a 650 MWh BYD-based BESS at Cloudbreak, the final major assets in its Real Zero decarbonisation plan for iron ore operations. The utility-scale PV and storage will feed Fortescue’s integrated Pilbara Energy Connect network, designed to displace large diesel and gas loads across multiple mines. For mine planners and electrical engineers, the build-out signals rapid scaling of high-penetration renewables and grid-forming storage in remote, weak-grid conditions.

    Meiteng’s full-size coal dry separation plant in Mongolia: design notes for mine engineers
    Mining
    about 15 hours ago

    Meiteng’s full-size coal dry separation plant in Mongolia: design notes for mine engineers

    Meiteng Technology’s full-size intelligent coal dry separation plant in Mongolia has run stably since October 2025, using its proprietary DCP Full-Size Coal Dry Separation Dream Plant system under harsh continental climate conditions. The installation applies fully dry, sensor-based coal separation without process water, reducing reliance on traditional dense medium circuits and associated tailings dams. For mine operators in arid or freezing regions, the project signals growing viability of large-scale dry beneficiation where water supply, freezing pipelines and slurry management constrain conventional plants.

    Forrestania–Newington gold acquisition: district-scale planning notes for mine teams
    Mining
    about 20 hours ago

    Forrestania–Newington gold acquisition: district-scale planning notes for mine teams

    Forrestania Resources has agreed to acquire 100 per cent of Midas Minerals’ Newington gold project in Western Australia, securing a package of granted mining and exploration tenements in a historically high-yield gold district. The transaction consolidates Forrestania’s Western Australian gold footprint around Newington, giving it full control over both existing mining leases and surrounding exploration ground. For geologists and mine planners, the deal creates a larger, contiguous tenure position that can support district-scale resource definition and staged development drilling.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.