Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Contract Award

    MMS expands Tennant Creek footprint: pit integration and geotech notes for engineers

    May 22, 2026|

    Reviewed by Joe Ashwell

    MMS expands Tennant Creek footprint: pit integration and geotech notes for engineers

    First reported on International Mining – News

    30 Second Briefing

    Mineral Mining Services (MMS) has secured a contract expansion with Tennant Mines at the Nobles project in Tennant Creek, Northern Territory, extending its work into the Juno and Golden Forty box cuts plus the Golden Kangaroo area at the historic goldfield. The deal materially increases MMS’s open-cut mining scope, consolidating multiple adjacent pits under a single contractor. Geotechnical teams will need to manage legacy workings and variable ground conditions typical of Tennant Creek’s narrow, high-grade gold lodes as MMS deepens and widens existing box cuts.

    Technical Brief

    • MMS now coordinates multiple adjacent pits under a single mine plan, simplifying haulage and drill‑and‑blast scheduling.
    • Unified contract structure allows shared use of mobile plant across Juno, Golden Forty and Golden Kangaroo.
    • Integration of additional box cuts will require re‑sequencing of waste stripping and ore exposure across the Nobles area.
    • Expanded footprint enables longer-term employment of MMS’s existing open‑cut fleet, reducing mobilisation/demobilisation cycles.
    • Single‑contractor model should streamline geotechnical data management and slope design updates across the clustered pits.
    • Tennant Creek’s historic status implies interaction with legacy surface infrastructure and access tracks when planning new cutbacks.

    Our Take

    Mineral Mining Services’ new work at Tennant Creek follows its recent RC drilling at the Leonora South gold project and a full mining services contract at Davyhurst in Western Australia, signalling that MMS is building a multi-jurisdictional gold services portfolio across Australia rather than remaining tied to a single camp.

    Our database shows relatively few Northern Territory gold project items compared with Western Australian coverage, so MMS’s presence at the Nobles project and associated Tennant Creek assets positions it early in what could be a renewed phase of contractor-led activity in this historic field.

    With Pan African Resources moving to acquire Emmerson Resources, which has fresh discoveries in the Tennant Creek Mineral Field, MMS’s operational foothold in the same gold district could become strategically important as larger owners look for established local contractors to accelerate development schedules.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 15 hours ago

    Fortescue Real Zero: 690 MW solar and 650 MWh BESS implications for mine power design

    Construction has commenced on Fortescue’s 690 MW Turner River solar farm in the Pilbara and a 650 MWh BYD-based BESS at Cloudbreak, the final major assets in its Real Zero decarbonisation plan for iron ore operations. The utility-scale PV and storage will feed Fortescue’s integrated Pilbara Energy Connect network, designed to displace large diesel and gas loads across multiple mines. For mine planners and electrical engineers, the build-out signals rapid scaling of high-penetration renewables and grid-forming storage in remote, weak-grid conditions.

    Meiteng’s full-size coal dry separation plant in Mongolia: design notes for mine engineers
    Mining
    about 15 hours ago

    Meiteng’s full-size coal dry separation plant in Mongolia: design notes for mine engineers

    Meiteng Technology’s full-size intelligent coal dry separation plant in Mongolia has run stably since October 2025, using its proprietary DCP Full-Size Coal Dry Separation Dream Plant system under harsh continental climate conditions. The installation applies fully dry, sensor-based coal separation without process water, reducing reliance on traditional dense medium circuits and associated tailings dams. For mine operators in arid or freezing regions, the project signals growing viability of large-scale dry beneficiation where water supply, freezing pipelines and slurry management constrain conventional plants.

    Forrestania–Newington gold acquisition: district-scale planning notes for mine teams
    Mining
    about 20 hours ago

    Forrestania–Newington gold acquisition: district-scale planning notes for mine teams

    Forrestania Resources has agreed to acquire 100 per cent of Midas Minerals’ Newington gold project in Western Australia, securing a package of granted mining and exploration tenements in a historically high-yield gold district. The transaction consolidates Forrestania’s Western Australian gold footprint around Newington, giving it full control over both existing mining leases and surrounding exploration ground. For geologists and mine planners, the deal creates a larger, contiguous tenure position that can support district-scale resource definition and staged development drilling.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.