Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Product

    Meiteng ZhiMei Master AI for coal processing: control and retrofit notes for engineers

    May 18, 2026|

    Reviewed by Tom Sullivan

    Meiteng ZhiMei Master AI for coal processing: control and retrofit notes for engineers

    First reported on International Mining – News

    30 Second Briefing

    Meiteng’s ZhiMei Master large AI model for coal preparation was showcased at a CCPUA technical exchange in Jincheng on 24–25 April 2026, hosted with Jinneng Holding Equipment Manufacturing Group. Built on domain data from dense medium separation, flotation and dewatering circuits, the model targets intelligent control of product ash, yield and reagent dosage across complex coal washing plants. For process engineers, the move signals rapid deployment of plant-level AI optimisation in China’s large state-owned coal operations, with implications for retrofitting existing preparation facilities.

    Technical Brief

    • For other coal processors, key implication is AI retrofits that sit above current instrumentation without major civils or mechanical changes.

    Our Take

    Jincheng’s role as the locus for this April 2026 technical exchange suggests Shanxi-based coal equipment makers such as Jinneng Holding Equipment Manufacturing Group are trying to anchor AI development close to China’s traditional coal heartland, which can ease deployment into existing preparation plants and training of local operators.

    Because this is tagged both Projects and Product in our coverage, ZhiMei Master is likely being framed not just as a one-off digital initiative but as a commercialisable platform that OEMs and coal processors across China could bolt onto brownfield plants, with implications for retrofitting rather than greenfield-only adoption.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 16 hours ago

    Fortescue Real Zero: 690 MW solar and 650 MWh BESS implications for mine power design

    Construction has commenced on Fortescue’s 690 MW Turner River solar farm in the Pilbara and a 650 MWh BYD-based BESS at Cloudbreak, the final major assets in its Real Zero decarbonisation plan for iron ore operations. The utility-scale PV and storage will feed Fortescue’s integrated Pilbara Energy Connect network, designed to displace large diesel and gas loads across multiple mines. For mine planners and electrical engineers, the build-out signals rapid scaling of high-penetration renewables and grid-forming storage in remote, weak-grid conditions.

    Meiteng’s full-size coal dry separation plant in Mongolia: design notes for mine engineers
    Mining
    about 16 hours ago

    Meiteng’s full-size coal dry separation plant in Mongolia: design notes for mine engineers

    Meiteng Technology’s full-size intelligent coal dry separation plant in Mongolia has run stably since October 2025, using its proprietary DCP Full-Size Coal Dry Separation Dream Plant system under harsh continental climate conditions. The installation applies fully dry, sensor-based coal separation without process water, reducing reliance on traditional dense medium circuits and associated tailings dams. For mine operators in arid or freezing regions, the project signals growing viability of large-scale dry beneficiation where water supply, freezing pipelines and slurry management constrain conventional plants.

    Forrestania–Newington gold acquisition: district-scale planning notes for mine teams
    Mining
    about 22 hours ago

    Forrestania–Newington gold acquisition: district-scale planning notes for mine teams

    Forrestania Resources has agreed to acquire 100 per cent of Midas Minerals’ Newington gold project in Western Australia, securing a package of granted mining and exploration tenements in a historically high-yield gold district. The transaction consolidates Forrestania’s Western Australian gold footprint around Newington, giving it full control over both existing mining leases and surrounding exploration ground. For geologists and mine planners, the deal creates a larger, contiguous tenure position that can support district-scale resource definition and staged development drilling.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.