Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Macmahon wins Kucing Liar underground works: design and services lens for engineers

    November 20, 2026|

    Reviewed by Tom Sullivan

    Macmahon wins Kucing Liar underground works: design and services lens for engineers

    First reported on International Mining – News

    30 Second Briefing

    Macmahon Holdings’ subsidiary PT Macmahon Indonesia has been named preferred contractor by PT Freeport Indonesia for underground construction at the Kucing Liar Underground Mine Complex in Papua. The package covers fixed facilities across three underground levels, including heavy-equipment maintenance workshops, refuelling stations, wash bays and multiple pump stations integrated into the mine’s existing infrastructure. The works point to substantial underground services demand and long-term contractor presence as Kucing Liar ramps up alongside the Grasberg Block Cave operations.

    Technical Brief

    • Appointment is as “preferred contractor”, indicating pending conversion to a fully executed construction contract.
    • Scope is limited to underground fixed infrastructure; no production mining or development headings included.
    • Multi-level facility construction suggests vertical materials handling, ventilation and egress links between the three levels.
    • Underground workshops and refuelling areas will require fire-rated construction, drainage, and mine-vent compliance design.
    • Pump station installations imply substantial mine-water management needs as Kucing Liar deepens and expands.
    • Similar underground fixed-facility packages on large caving mines often run multi-year, supporting long-term contractor presence.

    Our Take

    Indonesia features frequently in our Mining project coverage, and underground developments like the Kucing Liar Underground Mine Complex typically signal a maturing phase of large porphyry operations where access to deeper ore becomes critical to sustaining output.

    Macmahon Holdings Limited has appeared in several of our project and contract award items as a preferred contractor in challenging geologies, so PT Macmahon Indonesia’s role here likely strengthens its positioning for further underground and civil packages in the Indonesian copper–gold belt.

    For PT Freeport Indonesia, awarding substantial construction works at Kucing Liar indicates that long-lead underground infrastructure is now being locked in, which usually precedes a multi‑year cycle of follow‑on contracts for ground support, materials handling, and mine services in our project database.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 2 hours ago

    Jiangxi Siton at bauma CHINA 2026: underground fleet takeaways for mine engineers

    Jiangxi Siton is using bauma CHINA 2026 to showcase six underground models, signalling its push beyond China where it already supplies Latin American and Central Asian mines. The company, a key supplier to Jiangxi Copper and other major Chinese mining houses, is positioning its drilling, loading and haulage equipment for both hard rock and coal operations. For engineers, the message is that Chinese OEMs with proven export fleets are now credible alternatives to established Western brands for new underground project tenders and fleet renewals.

    Price floors for rare earth projects beyond China: financing lens for engineers
    Mining
    about 4 hours ago

    Price floors for rare earth projects beyond China: financing lens for engineers

    Western buyers are paying extreme premiums for rare earth oxides as China’s export controls bite, with high‑purity yttrium oxide at about US$1,650/kg in North America versus roughly US$9/kg in China and dysprosium oxide in Europe at about US$4,875/kg, around 22 times the Chinese price. Sprott’s Paul Wong and Jacob White argue that long‑term offtake contracts with price floors, such as MP Materials’ 10‑year US DoD deal at US$110/kg for NdPr and Lynas’ March 2025 floor agreement with JARE, are becoming critical to debt financing new separation and refining capacity. Equity markets remain weak, with the Sprott Rare Earths Ex‑China ETF down 30% since 30 September despite over US$100 million of net inflows, pushing developers towards structured contracts and, in cases like South Africa’s Steenkampskraal, staged lab‑to‑pilot separation trials with partners such as Remedy Metals.

    Kazatomprom bribery probe: operational and project risk notes for mine planners
    Mining
    about 5 hours ago

    Kazatomprom bribery probe: operational and project risk notes for mine planners

    Kazakhstan’s anti-corruption service has detained Kazatomprom operations chief Kuanysh Omarbekov in a widening bribery probe linked to former leaders of sovereign wealth fund Samruk-Kazyna, which controls 63% of the world’s largest uranium miner and managed $88 billion in assets at end-2025. Kazatomprom, whose operations are expected to yield 27,500–29,000 tonnes of uranium in 2026 (14,500–15,500 tonnes attributable), has removed Omarbekov and chief commercial officer Vladislav Baiguzhin, while insisting production and commercial teams remain intact. The investigation comes as Kazatomprom’s global depositary receipts fell nearly 10% in London to $49.80, and as Canadian partner Cameco advances 2026 deliveries from the Inkai mine totalling 10.4 million lb. U3O8.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy