Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Safety

    Lichfield & Hatherton canal jacked culverts: design and settlement control for engineers

    October 23, 2026|

    Reviewed by Joe Ashwell

    Lichfield & Hatherton canal jacked culverts: design and settlement control for engineers

    First reported on New Civil Engineer

    30 Second Briefing

    Restoration of the Lichfield and Hatherton canals will require jacked culverts to be installed beneath the A38 and an active railway, reinstating historic waterway alignments severed by past road and rail schemes. Engineers must design low-cover, large-diameter culvert barrels capable of carrying canal navigation loads while maintaining motorway and rail traffic, likely using long-distance pipe jacking from constrained launch shafts. The works will demand careful settlement control, continuous monitoring of track and pavement, and robust groundwater management to protect both existing infrastructure and canal water levels.

    Technical Brief

    • Similar UK canal reinstatements under live infrastructure increasingly adopt jacked solutions to avoid open‑cut risks and long diversions.

    Our Take

    Other New Civil Engineer coverage in our database, such as the webinar on BIM and asset data handover, suggests that jacked culvert works beneath the A38 and a railway will likely face scrutiny on how construction and as-built data are managed for long-term asset stewardship.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Fens Reservoir earthworks trials: settlement and seepage lessons for engineers
    Geotechnical
    5 days ago

    Fens Reservoir earthworks trials: settlement and seepage lessons for engineers

    Consultation has opened on temporary earthworks trials by Anglian Water and Cambridge Water to test construction methods for a proposed £2.2bn strategic reservoir in the Cambridgeshire Fens. The trials will focus on how to build and compact large embankments in low-lying, soft ground typical of fenland, de-risking long-term settlement and seepage behaviour before full design is finalised. Outcomes will influence material selection, ground improvement strategy and construction sequencing for the main reservoir earthworks.

    Geobear stabilises Hackbridge Station: geopolymer injection lessons for ground engineers
    Geotechnical
    7 days ago

    Geobear stabilises Hackbridge Station: geopolymer injection lessons for ground engineers

    Geobear has stabilised foundations at Hackbridge Station in South London by injecting expanding geopolymer beneath an 1868 station extension instead of using traditional underpinning. More than 30 injection points at 1 m centres were drilled through the existing floor, with steel tubes delivering material at three treatment depths to about 3 m, targeting clay weakened by historic drainage failures and waterlogged conditions at 1.3–3.3 m depth. The non-vibratory, internal-only works avoided major excavation near live Southern and Thameslink infrastructure and reduced risk of inducing further differential movement.

    Former Australian coal mine solar and battery: geotechnical lessons for engineers
    Geotechnical
    10 days ago

    Former Australian coal mine solar and battery: geotechnical lessons for engineers

    A 176MW solar farm with a 100MWh battery system is being built on a former coal mine site near Muswellbrook in New South Wales, repurposing disturbed land for large-scale renewable generation. Converting the pit and spoil areas to PV arrays and battery pads will require detailed geotechnical validation of backfilled ground, settlement behaviour and drainage, along with management of any residual mine subsidence. For civil contractors, the project offers brownfield grid connection advantages but demands careful earthworks, foundation design and contamination control.

    Related Industries & Products

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.