Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Product

    Digital gold could triple by 2031: WGC outlook and custody design notes

    October 19, 2026|

    Reviewed by Joe Ashwell

    Digital gold could triple by 2031: WGC outlook and custody design notes

    First reported on MINING.com

    30 Second Briefing

    Digital gold holdings could reach US$160–170 billion by 2031, up from US$45–55 billion today, bringing an estimated US$95 billion in new money into bullion if providers solve trust and access issues, according to a World Gold Council–Boston Consulting Group model based on 12,000 investors in 12 countries. Vaulted accounts currently make up 89% of the digital market, with adoption up to seven times higher where products are integrated into banking or payment apps, and awareness ranging from 76% in Indonesia to 19% in Canada. The Council plans a shared “Gold as a Service” infrastructure to standardise sourcing, custody, compliance and redemption, addressing concerns such as single-location physical redemption and 400-oz. minimum delivery thresholds.

    Technical Brief

    • Vaulted accounts currently supply 89% of digital gold exposure, with tokenised products providing the balance.
    • Survey base covered 12,000+ retail investors across 12 countries, extrapolated to 96 countries (98% investable wealth).
    • About 65% of modelled untapped demand is from investors with no prior gold exposure.
    • Four in five respondents ranked provider trust as the primary precondition for allocating to digital gold.
    • Physical redemption constraints include single global pick-up points and minimums tied to 400‑oz London Good Delivery bars.
    • A major security breach was cited by 44% of respondents as the most damaging confidence risk.
    • Awareness is highly uneven: 76% in Indonesia and 71% in India versus 19% in Canada.
    • Age split is material: 50% awareness among 25–34-year-olds compared with 23% for 55+ cohorts.
    • Scenario range spans a bear case of US$70–80 billion and an upside of US$270–280 billion by 2031, assuming flat gold prices.
    • World Gold Council’s planned “Gold as a Service” stack would centralise sourcing, custody, compliance and redemption workflows for issuers.

    Our Take

    The World Gold Council’s push on digital gold sits alongside its recent work on doré refining transparency and formalising artisanal mining, signalling a coordinated effort to make gold traceable and investable from mine to app-based product rather than treating these as separate policy tracks.

    With digital gold currently representing less than 1% of the physical investment market, the projected US$95 billion of new bullion inflows by 2031 would materially deepen liquidity for refiners and mints such as the Royal Mint and ABC Bullion, potentially reinforcing London and other established hubs rather than shifting trade to crypto-native venues.

    High awareness in Indonesia and India but very low awareness in Canada contrasts with our broader gold coverage, where institutional allocations in Western markets are already mature, implying that ‘gold-as-a-service’ platforms may find faster retail growth in emerging markets while North America remains dominated by ETFs and futures.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    CREST Hub for critical minerals: separation and flowsheet insights for engineers
    Materials
    3 days ago

    CREST Hub for critical minerals: separation and flowsheet insights for engineers

    A new ARC Research Hub for Critical Energy Separation Materials (CREST Hub), led by Monash University, will develop separation technologies to recover critical minerals from complex ores and waste streams, improve lithium production and cut emissions from materials processing. The national hub links five Australian universities with six industry partners to focus on advanced sorbents, membranes and process-intensification approaches for energy‑efficient separations. Outcomes are expected to target low‑grade and refractory deposits, tailings reprocessing and lower‑carbon flowsheets for battery‑material supply chains.

    Niron Magnetics’ $1.8bn Alabama plant: supply chain and design notes for engineers
    Materials
    5 days ago

    Niron Magnetics’ $1.8bn Alabama plant: supply chain and design notes for engineers

    Niron Magnetics will build a $1.8 billion, 1.6-million-square-foot advanced manufacturing campus at the Westgate Super Site in Dothan, Alabama, centred on a 10,000-ton high-volume plant producing rare-earth-free iron nitride permanent magnets. The facility, Niron’s second after a 1,500‑ton‑per‑year plant scheduled for 2027 in Sartell, is expected to add 700 high-wage jobs within five years and use abundant domestic iron and nitrogen feedstocks instead of neodymium. The project, backed by a separate $150 million, 20‑year US defence loan for Minnesota, signals a shift towards geographically diversified, rare-earth-free magnet supply for automotive, defence and AI infrastructure.

    Ecocem’s ACT at Westminster retrofit: low‑carbon concrete lessons for engineers
    Materials
    7 days ago

    Ecocem’s ACT at Westminster retrofit: low‑carbon concrete lessons for engineers

    Ecocem’s ACT low-carbon concrete, which can cut cement-related CO₂ by up to 70% and is compatible with standard batching and placement methods, has been specified by Sisk for the TP Bennett-designed retrofit of the former John Lewis HQ at 171 Victoria Street, Westminster. The scheme will deliver over 200,000 sq ft of Grade A workspace while retaining existing steelwork, concrete and around 500 stainless-steel window frames and glazed units in line with Westminster’s retrofit-first policy. ACT has already been proven on more than 40 European projects, including 9,000m³ at Chessy, France, and is backed by Ecocem’s €220m scale-up programme and a dedicated Dunkirk plant due online in 2027.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.