Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    Critical Metals’ eudialyte refinery in Romania: flowsheet and economics for engineers

    September 16, 2026|

    Reviewed by Tom Sullivan

    Critical Metals’ eudialyte refinery in Romania: flowsheet and economics for engineers

    First reported on MINING.com

    30 Second Briefing

    Critical Metals plans a $1.85 billion refinery in Romania capable of processing up to 100,000 tonnes per year of eudialyte concentrate from its Tanbreez project in Greenland, using a patent-pending mixed-acid leach that dissolves over 99% of the mineral and recovers 19 ultra-high-purity rare earth and critical metal products. Current modelling forecasts about 27,943 tonnes per year of chloride salts and related products plus 25,670 tonnes per year of high-purity SiO2, with silica by-product revenues alone estimated at roughly $600 million annually. The flowsheet targets tailings of only ~1% of feed and includes production of 50–70 tpa of high-purity hafnium metal and 20–30 tpa hafnium chloride, with projected NPV10 of $4.5 billion, 55% IRR and a two-year payback.

    Technical Brief

    • Multistage mixed-acid leach at elevated temperature is used to prevent eudialyte forming unfilterable silica gel.
    • Process flowsheet includes cascading recovery stages to sequentially produce high-purity rare earth salts and metals.
    • Silicate recovery system is modelled to generate US$400–600 million/year from SiO2 plus avoided acid consumption.
    • Tailings are targeted at ~1% of feed tonnage by recovering silica and potentially alumina, iron and copper.
    • Key value drivers in the product mix are SiO2, NbCl5, DyCl3, TaCl5 and hafnium products.
    • Refinery is structured as a Romanian joint venture receiving 50% of Tanbreez concentrate under an existing term sheet.
    • Location in EU/NATO-member Romania is explicitly aimed at securing a Western rare earth and critical metals supply chain.

    Our Take

    Critical Metals’ plan to route up to 50% of Tanbreez concentrate to a Romania refinery sits alongside its 15‑year offtake with REalloys for up to 15% of output, signalling that the Greenland asset is being carved up into multiple downstream channels rather than a single anchor customer.

    The projected 50–70 tpa of high‑purity hafnium metal and 20–30 tpa of hafnium chloride from the Romania facility would position CRML unusually far up the value chain among rare earth players in our database, which mostly stop at mixed REE or magnet-grade oxides.

    With a modelled NPV10 of US$4.5 billion and IRR of 55% on US$1.85 billion capex, this Romania refinery is one of the more aggressive rare earth/critical metal processing proposals in our coverage, implying strong sensitivity to execution risk on the patent‑pending eudialyte flowsheet and long-term pricing for zirconium, hafnium and heavy REEs.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Gold price slides on strong dollar: planning implications for mine projects
    Mining
    about 16 hours ago

    Gold price slides on strong dollar: planning implications for mine projects

    Gold prices slipped to a one-week low as spot gold fell 0.4% to $4,271.16/oz in New York and December futures eased 0.3% to $4,306 amid a stronger US dollar and expectations of more hawkish US Federal Reserve rate moves. The dollar hit a two-month high and US 10-year Treasury yields hovered near a 20-year peak, sharply raising the opportunity cost of holding non-yielding bullion. Oil gained about 1% on stalled US–Iran talks over the war, while spot silver dropped 1.8% to $63.29/oz, platinum 0.2% to $1,746.44, and palladium rose 0.5% to $1,266.40.

    OceanaGold Waihi expansion: design, throughput and tailings notes for engineers
    Mining
    about 16 hours ago

    OceanaGold Waihi expansion: design, throughput and tailings notes for engineers

    OceanaGold is weighing a 50% expansion of its Waihi plant to 1.2 Mt/y after Wharekirauponga drilling returned standout intercepts including 6.3 m at 97.2 g/t Au from 481.5 m in the East Graben vein and 8.5 m at 41.5 g/t from 399 m. The move would enable concurrent feed from Martha Underground and Wharekirauponga post‑2032, building on a 2024 plan outlining 1.6 Moz over 15 years and an initial 4.1 Mt reserve at 9.2 g/t. Underground development is advancing, with the Waihi North decline now 350 m, first vent shaft under construction, staged commissioning of a new water treatment plant, and early works on a new tailings storage facility due in Q4.

    Kinross Gold output cut and higher AISC: operational drivers and FCF lens for mine teams
    Mining
    about 17 hours ago

    Kinross Gold output cut and higher AISC: operational drivers and FCF lens for mine teams

    Kinross Gold has cut its 2026–27 production outlook by about 8% to 1.84–1.86 million attributable gold-equivalent oz. a year and raised 2024 AISC guidance to $1,850–$1,900/oz after winter storms, copper-rich sulphide ore and poor recoveries at La Coipa in Chile, plus weaker mining rates, grades and recoveries at Round Mountain Phase S in Nevada. The company is stockpiling high-copper material, studying a new flotation circuit for deeper sulphide mineralisation that may overlie a copper porphyry system, and using a smaller shovel at Round Mountain to cut dilution. Despite the operational hit and a Q3 output cut to about 425,000 oz., Kinross has lifted its 2026 shareholder return target to 50% of free cash flow and has already returned about $800 million this year, mainly via $655 million in buybacks.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy