Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Sustainability

    Chile’s $111bn mining boom: lithium approvals and copper pipeline for project teams

    November 20, 2026|

    Reviewed by Joe Ashwell

    Chile’s $111bn mining boom: lithium approvals and copper pipeline for project teams

    First reported on MINING.com

    30 Second Briefing

    Chile’s mining investment pipeline has climbed to $111.1 billion for 2026–2035, with lithium projects doubling to $10.8 billion and two DLE-based schemes — Albemarle’s $3.1‑billion conversion and the $3‑billion Salar Futuro JV between Codelco and SQM — now awaiting SEA environmental approval. Copper still dominates at $93.9 billion, including BHP’s $1.3‑billion Escondida leaching extension to sustain 210,000 t/y cathode output and Capstone’s $500‑million Mantos Blancos upgrade to 9.8 Mt/y sulphide throughput. Antofagasta alone hosts $51.5 billion of projects, intensifying pressure on housing, services and transport corridors such as the Capricorn Bioceanic Corridor.

    Technical Brief

    • Cochilco’s updated portfolio covers 72 mining projects for 2026–2035, up from 59 previously.
    • Lithium accounted for $6.1 billion of the $6.6‑billion portfolio increase between surveys, dominating incremental growth.
    • Albemarle’s $3.1‑billion DLE transition is designed to nearly double lithium recovery versus its current operation.
    • The Salar Futuro JV at Salar de Atacama targets 2031–2060 operations using DLE while extracting less brine.
    • Both Albemarle’s conversion and Salar Futuro remain under SEA environmental review, gating construction and contracting timelines.
    • Antofagasta region holds $51.5 billion of projects, ~46% of national pipeline, with copper schemes totalling $45 billion.
    • More than 50% of Antofagasta’s mining workforce resides outside the region, stressing fly‑in/fly‑out logistics and camp capacity.

    Our Take

    SQM and Albemarle both feature heavily across our recent lithium coverage, including Chile’s mid‑2026 export surge and SQM’s Mt Holland expansion in Australia, signalling that decisions on Salar de Atacama and the $10.8 billion Chilean lithium pipeline will shape not just Chilean output but their global portfolio balance between brine and hard‑rock supply.

    The projected 3.55 million tonnes LCE global supply by 2035, set against Chile’s $6.1 billion in lithium projects under environmental review, implies that prolonged SEA approvals could see Argentina or Australian spodumene projects (like Finniss and Mt Holland in our database) capture marginal demand that might otherwise have gone to Chilean brines and DLE conversions.

    With copper still accounting for 84.5% of Chile’s planned mining spend and major brownfield work at Escondida and Mantos Blancos, operators in Antofagasta face a dual constraint: any delay in lithium approvals risks undercutting Chile’s diversification narrative while the region already relies on an external workforce share above 50%, tightening labour and infrastructure planning for both copper and lithium build‑outs.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 2 hours ago

    Jiangxi Siton at bauma CHINA 2026: underground fleet takeaways for mine engineers

    Jiangxi Siton is using bauma CHINA 2026 to showcase six underground models, signalling its push beyond China where it already supplies Latin American and Central Asian mines. The company, a key supplier to Jiangxi Copper and other major Chinese mining houses, is positioning its drilling, loading and haulage equipment for both hard rock and coal operations. For engineers, the message is that Chinese OEMs with proven export fleets are now credible alternatives to established Western brands for new underground project tenders and fleet renewals.

    Price floors for rare earth projects beyond China: financing lens for engineers
    Mining
    about 4 hours ago

    Price floors for rare earth projects beyond China: financing lens for engineers

    Western buyers are paying extreme premiums for rare earth oxides as China’s export controls bite, with high‑purity yttrium oxide at about US$1,650/kg in North America versus roughly US$9/kg in China and dysprosium oxide in Europe at about US$4,875/kg, around 22 times the Chinese price. Sprott’s Paul Wong and Jacob White argue that long‑term offtake contracts with price floors, such as MP Materials’ 10‑year US DoD deal at US$110/kg for NdPr and Lynas’ March 2025 floor agreement with JARE, are becoming critical to debt financing new separation and refining capacity. Equity markets remain weak, with the Sprott Rare Earths Ex‑China ETF down 30% since 30 September despite over US$100 million of net inflows, pushing developers towards structured contracts and, in cases like South Africa’s Steenkampskraal, staged lab‑to‑pilot separation trials with partners such as Remedy Metals.

    Kazatomprom bribery probe: operational and project risk notes for mine planners
    Mining
    about 5 hours ago

    Kazatomprom bribery probe: operational and project risk notes for mine planners

    Kazakhstan’s anti-corruption service has detained Kazatomprom operations chief Kuanysh Omarbekov in a widening bribery probe linked to former leaders of sovereign wealth fund Samruk-Kazyna, which controls 63% of the world’s largest uranium miner and managed $88 billion in assets at end-2025. Kazatomprom, whose operations are expected to yield 27,500–29,000 tonnes of uranium in 2026 (14,500–15,500 tonnes attributable), has removed Omarbekov and chief commercial officer Vladislav Baiguzhin, while insisting production and commercial teams remain intact. The investigation comes as Kazatomprom’s global depositary receipts fell nearly 10% in London to $49.80, and as Canadian partner Cameco advances 2026 deliveries from the Inkai mine totalling 10.4 million lb. U3O8.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.