Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Product

    Argentina’s mining ramp‑up: FLS and Sandvik openings – key notes for project engineers

    September 21, 2026|

    Reviewed by Joe Ashwell

    Argentina’s mining ramp‑up: FLS and Sandvik openings – key notes for project engineers

    First reported on International Mining – News

    30 Second Briefing

    Argentina’s rapid mining build-out under President Javier Milei, anchored by major copper and lithium projects such as Taca Taca, Los Azules, El Pachón, Josemaría, Rincon and PPG, is triggering new in-country investments by OEMs FLSmidth (FLS) and Sandvik. Both suppliers are opening additional Argentine locations to support large-scale concentrators and leach operations, positioning for long-life copper porphyry and brine projects that will demand high-throughput crushing, grinding and materials handling systems. For engineers, this signals growing local availability of technical services, spares and process optimisation support.

    Technical Brief

    • Named greenfield copper and lithium projects include Taca Taca, Los Azules, Altar, El Pachón, PPG, Rincon and Josemaría.
    • Project pipeline spans both porphyry copper concentrators and lithium brine operations, implying diverse flowsheet requirements.
    • Concentrator builds at sites like Taca Taca and Josemaría will demand large SAG/ball mills and high-capacity crushers.
    • Lithium brine schemes such as Rincon and PPG point to significant leach, evaporation and impurity-removal plant demand.
    • El Pachón and Altar, as high-altitude Andean porphyries, will require cold-climate materials handling and dewatering solutions.
    • Long-haul logistics from Andean sites to ports will increase reliance on robust conveying, stacking and loading systems.
    • OEM in-country presence reduces lead times for critical wear parts on grinding, crushing and pumping circuits.

    Our Take

    FLS’s new presence in Argentina for copper and lithium projects like Taca Taca and Los Azules aligns with its recent push to anchor regional service hubs, as seen in the US$15 million Karaganda expansion in Kazakhstan, signalling a strategy to lock in aftermarket and lifecycle work close to large greenfield builds.

    Across the 1278 Mining stories in our database, copper and lithium pieces are disproportionately tied to multi-asset project clusters like Josemaria–Altar–El Pachon, which typically drive early moves by OEMs such as FLS and Sandvik to secure long-term equipment and parts corridors.

    Javier Milei’s Argentina focus on mining-friendly policy, combined with OEM localisation, likely shortens response times for high-wear process and drilling components at projects such as Rincon and PPG, which can materially improve uptime in remote Andean operations compared with importing from Brazil or Chile-based hubs.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Gold price slides on strong dollar: planning implications for mine projects
    Mining
    about 16 hours ago

    Gold price slides on strong dollar: planning implications for mine projects

    Gold prices slipped to a one-week low as spot gold fell 0.4% to $4,271.16/oz in New York and December futures eased 0.3% to $4,306 amid a stronger US dollar and expectations of more hawkish US Federal Reserve rate moves. The dollar hit a two-month high and US 10-year Treasury yields hovered near a 20-year peak, sharply raising the opportunity cost of holding non-yielding bullion. Oil gained about 1% on stalled US–Iran talks over the war, while spot silver dropped 1.8% to $63.29/oz, platinum 0.2% to $1,746.44, and palladium rose 0.5% to $1,266.40.

    OceanaGold Waihi expansion: design, throughput and tailings notes for engineers
    Mining
    about 16 hours ago

    OceanaGold Waihi expansion: design, throughput and tailings notes for engineers

    OceanaGold is weighing a 50% expansion of its Waihi plant to 1.2 Mt/y after Wharekirauponga drilling returned standout intercepts including 6.3 m at 97.2 g/t Au from 481.5 m in the East Graben vein and 8.5 m at 41.5 g/t from 399 m. The move would enable concurrent feed from Martha Underground and Wharekirauponga post‑2032, building on a 2024 plan outlining 1.6 Moz over 15 years and an initial 4.1 Mt reserve at 9.2 g/t. Underground development is advancing, with the Waihi North decline now 350 m, first vent shaft under construction, staged commissioning of a new water treatment plant, and early works on a new tailings storage facility due in Q4.

    Kinross Gold output cut and higher AISC: operational drivers and FCF lens for mine teams
    Mining
    about 17 hours ago

    Kinross Gold output cut and higher AISC: operational drivers and FCF lens for mine teams

    Kinross Gold has cut its 2026–27 production outlook by about 8% to 1.84–1.86 million attributable gold-equivalent oz. a year and raised 2024 AISC guidance to $1,850–$1,900/oz after winter storms, copper-rich sulphide ore and poor recoveries at La Coipa in Chile, plus weaker mining rates, grades and recoveries at Round Mountain Phase S in Nevada. The company is stockpiling high-copper material, studying a new flotation circuit for deeper sulphide mineralisation that may overlie a copper porphyry system, and using a smaller shovel at Round Mountain to cut dilution. Despite the operational hit and a Q3 output cut to about 425,000 oz., Kinross has lifted its 2026 shareholder return target to 50% of free cash flow and has already returned about $800 million this year, mainly via $655 million in buybacks.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.