Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Product
    Projects

    Aquajet Evolution 3.1 and Ecosilence 400 hp: hydrodemolition notes for engineers

    November 9, 2026|

    Reviewed by Joe Ashwell

    Aquajet Evolution 3.1 and Ecosilence 400 hp: hydrodemolition notes for engineers

    First reported on The Construction Index

    30 Second Briefing

    Hydrodemolition specialist Aquajet has released the Evolution 3.1 control system alongside three dedicated Aqua Cutter 450 attachments and a 400 hp Ecosilence high-pressure pump unit. Evolution 3.1 introduces updated process control for concrete removal, enabling more precise jet positioning and automated parameter adjustment on Aqua Cutter robots. The 400 hp Ecosilence package is designed to deliver stable high-pressure water for thick-section concrete and heavily reinforced structures while reducing on-site noise and fuel use compared with earlier units.

    Technical Brief

    • For asset owners, higher hydrodemolition precision supports selective removal around congested reinforcement, reducing patch repair volumes.

    Our Take

    The Evolution 3.1 control system and the three dedicated Aqua Cutter 450 attachments signal that Aquajet is betting on modular, software-driven upgrades rather than entirely new carrier platforms, which typically lowers lifecycle cost for fleet owners on long-running infrastructure rehabilitation programmes.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    CREST Hub for critical minerals: separation and flowsheet insights for engineers
    Materials
    3 days ago

    CREST Hub for critical minerals: separation and flowsheet insights for engineers

    A new ARC Research Hub for Critical Energy Separation Materials (CREST Hub), led by Monash University, will develop separation technologies to recover critical minerals from complex ores and waste streams, improve lithium production and cut emissions from materials processing. The national hub links five Australian universities with six industry partners to focus on advanced sorbents, membranes and process-intensification approaches for energy‑efficient separations. Outcomes are expected to target low‑grade and refractory deposits, tailings reprocessing and lower‑carbon flowsheets for battery‑material supply chains.

    Niron Magnetics’ $1.8bn Alabama plant: supply chain and design notes for engineers
    Materials
    5 days ago

    Niron Magnetics’ $1.8bn Alabama plant: supply chain and design notes for engineers

    Niron Magnetics will build a $1.8 billion, 1.6-million-square-foot advanced manufacturing campus at the Westgate Super Site in Dothan, Alabama, centred on a 10,000-ton high-volume plant producing rare-earth-free iron nitride permanent magnets. The facility, Niron’s second after a 1,500‑ton‑per‑year plant scheduled for 2027 in Sartell, is expected to add 700 high-wage jobs within five years and use abundant domestic iron and nitrogen feedstocks instead of neodymium. The project, backed by a separate $150 million, 20‑year US defence loan for Minnesota, signals a shift towards geographically diversified, rare-earth-free magnet supply for automotive, defence and AI infrastructure.

    Ecocem’s ACT at Westminster retrofit: low‑carbon concrete lessons for engineers
    Materials
    7 days ago

    Ecocem’s ACT at Westminster retrofit: low‑carbon concrete lessons for engineers

    Ecocem’s ACT low-carbon concrete, which can cut cement-related CO₂ by up to 70% and is compatible with standard batching and placement methods, has been specified by Sisk for the TP Bennett-designed retrofit of the former John Lewis HQ at 171 Victoria Street, Westminster. The scheme will deliver over 200,000 sq ft of Grade A workspace while retaining existing steelwork, concrete and around 500 stainless-steel window frames and glazed units in line with Westminster’s retrofit-first policy. ACT has already been proven on more than 40 European projects, including 9,000m³ at Chessy, France, and is backed by Ecocem’s €220m scale-up programme and a dedicated Dunkirk plant due online in 2027.

    Related Industries & Products

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.