Geomechanics.io

  • Free Tools
Sign UpLog In
AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    AFRY EPCM at Cabaçal project: design and constructability notes for mine engineers

    November 18, 2026|

    Reviewed by Joe Ashwell

    AFRY EPCM at Cabaçal project: design and constructability notes for mine engineers

    First reported on International Mining – News

    30 Second Briefing

    AFRY will deliver full engineering, procurement and construction management (EPCM) services for Rio Cabaçal Mineração’s Cabaçal copper-gold-silver project in Mato Grosso, Brazil, a key asset of Meridian Mining. The mandate covers process plant, mine infrastructure and associated utilities, positioning AFRY to define flowsheets, specify major equipment packages and coordinate construction sequencing. For engineers, the contract signals upcoming demand for detailed geotechnical design, tailings and water management solutions, and constructability planning suited to remote Central Brazilian conditions.

    Technical Brief

    • EPCM scope is expected to extend from open-pit mine design through to surface infrastructure and utilities.
    • AFRY’s remit typically includes detailed earthworks design for plant platforms, haul roads and drainage.
    • Contract structure allows integration of geotechnical, hydrological and structural inputs into a single coordinated 3D model.
    • Central Mato Grosso location implies logistical constraints for heavy equipment delivery and construction materials supply.
    • Remote setting will drive emphasis on self-sufficient power, water supply and on-site maintenance facilities.
    • Brazilian permitting regime will require alignment of EPCM design deliverables with federal and Mato Grosso state licensing stages.
    • Tailings and water management designs must account for intense seasonal rainfall and potential flood routing.
    • For similar greenfield mining projects, early EPCM engagement often compresses schedule by overlapping design and procurement.

    Our Take

    AFRY’s EPCM role at the Cabaçal copper-gold-silver project in Mato Grosso follows Meridian Mining’s move into pre-construction there, where more than twenty financing proposals of up to $400 million have been shortlisted, signalling that detailed engineering and constructability input will now be critical to closing a funding package.

    AFRY’s planned acquisition of Australian Mining Consultants (AMC) suggests that its work on Cabaçal in Brazil could be backed by an enlarged in-house capability across resource definition, mine planning and operations support, rather than a pure process-plant focus.

    In our database of 1279 Mining stories, copper- and gold-tagged projects like Cabaçal increasingly feature multi-commodity profiles (here including silver), which typically improves financing optionality but complicates metallurgical design and marketing strategies for operators such as Meridian Mining.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 2 hours ago

    Jiangxi Siton at bauma CHINA 2026: underground fleet takeaways for mine engineers

    Jiangxi Siton is using bauma CHINA 2026 to showcase six underground models, signalling its push beyond China where it already supplies Latin American and Central Asian mines. The company, a key supplier to Jiangxi Copper and other major Chinese mining houses, is positioning its drilling, loading and haulage equipment for both hard rock and coal operations. For engineers, the message is that Chinese OEMs with proven export fleets are now credible alternatives to established Western brands for new underground project tenders and fleet renewals.

    Price floors for rare earth projects beyond China: financing lens for engineers
    Mining
    about 4 hours ago

    Price floors for rare earth projects beyond China: financing lens for engineers

    Western buyers are paying extreme premiums for rare earth oxides as China’s export controls bite, with high‑purity yttrium oxide at about US$1,650/kg in North America versus roughly US$9/kg in China and dysprosium oxide in Europe at about US$4,875/kg, around 22 times the Chinese price. Sprott’s Paul Wong and Jacob White argue that long‑term offtake contracts with price floors, such as MP Materials’ 10‑year US DoD deal at US$110/kg for NdPr and Lynas’ March 2025 floor agreement with JARE, are becoming critical to debt financing new separation and refining capacity. Equity markets remain weak, with the Sprott Rare Earths Ex‑China ETF down 30% since 30 September despite over US$100 million of net inflows, pushing developers towards structured contracts and, in cases like South Africa’s Steenkampskraal, staged lab‑to‑pilot separation trials with partners such as Remedy Metals.

    Kazatomprom bribery probe: operational and project risk notes for mine planners
    Mining
    about 5 hours ago

    Kazatomprom bribery probe: operational and project risk notes for mine planners

    Kazakhstan’s anti-corruption service has detained Kazatomprom operations chief Kuanysh Omarbekov in a widening bribery probe linked to former leaders of sovereign wealth fund Samruk-Kazyna, which controls 63% of the world’s largest uranium miner and managed $88 billion in assets at end-2025. Kazatomprom, whose operations are expected to yield 27,500–29,000 tonnes of uranium in 2026 (14,500–15,500 tonnes attributable), has removed Omarbekov and chief commercial officer Vladislav Baiguzhin, while insisting production and commercial teams remain intact. The investigation comes as Kazatomprom’s global depositary receipts fell nearly 10% in London to $49.80, and as Canadian partner Cameco advances 2026 deliveries from the Inkai mine totalling 10.4 million lb. U3O8.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.