Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Safety
    Projects

    5,000 UK asbestos deaths a year: practical control lessons for project engineers

    May 15, 2026|

    Reviewed by Joe Ashwell

    5,000 UK asbestos deaths a year: practical control lessons for project engineers

    First reported on New Civil Engineer

    30 Second Briefing

    Annual UK asbestos-related deaths of around 5,000, cited by removal specialist Rhodar, are being used to warn that ageing building stock still contains extensive legacy asbestos in insulation boards, sprayed coatings and pipe lagging. The warning targets civil and infrastructure works on schools, hospitals and 1960s–80s public buildings, where intrusive refurbishments, drilling and core sampling risk disturbing poorly documented asbestos-containing materials. Engineers are being urged to tighten pre-construction surveys, update asbestos registers and enforce licensed removal and enclosure protocols on all invasive works.

    Technical Brief

    • Wider implication is that brownfield and refurbishment-heavy infrastructure pipelines will systematically elevate asbestos management workload.

    Our Take

    Given that New Civil Engineer also fronts industry awards and innovation challenges in the UK, this level of asbestos mortality is likely to influence judging and procurement criteria, with greater scrutiny on how project teams plan refurbishment, demolition and maintenance around asbestos-containing materials in existing infrastructure.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Sellafield worker death: ONR findings and safety oversight notes for engineers
    Hazards
    11 days ago

    Sellafield worker death: ONR findings and safety oversight notes for engineers

    A worker at the Sellafield nuclear decommissioning site “died suddenly” during the week commencing 6 July, prompting an immediate review by the Office for Nuclear Regulation (ONR). ONR has confirmed the death was not work-related and that there was no radiological or conventional safety incident affecting the wider site. Routine regulatory oversight of Sellafield’s legacy waste facilities, spent fuel management and construction activities continues unchanged, with no impact reported on nuclear safety cases or site operations.

    BGS River Tweed groundwater survey: flood model lessons for infrastructure engineers
    Hazards
    17 days ago

    BGS River Tweed groundwater survey: flood model lessons for infrastructure engineers

    The British Geological Survey has launched a four‑year ground investigation of the River Tweed catchment to characterise groundwater behaviour and its interaction with river levels for improved flood forecasting. Work will include installing new monitoring boreholes, logging groundwater heads and flow paths, and integrating hydrogeological data with existing river‑gauge and rainfall records across the cross‑border catchment. Findings are expected to refine flood models used by local authorities and infrastructure owners, particularly for groundwater‑dominated flood events and prolonged saturation of transport and drainage assets.

    Worsening wildfire seasons for mine operators: design and continuity lessons
    Hazards
    19 days ago

    Worsening wildfire seasons for mine operators: design and continuity lessons

    Wildfire seasons in Western Canada are intensifying, with 2023 seeing more than 2,240 fires burning 2.84 million hectares in B.C. and insured losses of $720 million in the Okanagan/Shuswap and $1.3 billion from the 2024 Jasper fire, forcing repeated evacuations at sites such as Artemis Gold’s Blackwater and Cameco’s Cigar Lake. Operators and insurers are now treating wildfire as a core business-interruption risk, driving investment in backup generation for long transmission corridors, detailed continuity planning, and stricter underwriting. Engineers are also redesigning mine layouts and buildings for fire, favouring sites on ridge tops, wider building separation, non-combustible steel roofing and use of natural and linear infrastructure firebreaks.

    Related Industries & Products

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy