Geomechanics.io

  • Free Tools
Sign UpLog In
AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Waratah’s shallow Goldenclad hit: open-pit potential and drilling notes for mine planners

    November 23, 2026|

    Reviewed by Joe Ashwell

    Waratah’s shallow Goldenclad hit: open-pit potential and drilling notes for mine planners

    First reported on Australian Mining

    30 Second Briefing

    Waratah Minerals has reported a standout diamond drill intercept of 10m at 12.18g/t Au from 49m depth within a broader 17m interval at 7.35g/t at the Goldenclad prospect in New South Wales. The mineralisation in hole GCD002 occurs at relatively shallow depths, materially improving open-pit potential and drill economics compared with typical deeper lode targets in the region. Results support Waratah’s strategy to grow the existing Spur gold project resource footprint, with follow-up drilling likely to focus on lateral continuity and down-dip extensions of the high-grade zone.

    Technical Brief

    • Shallow high-grade lodes reduce drill metre costs versus deeper or underground-focused targets in New South Wales.

    Our Take

    The shallow, high‑grade gold intercepts at the Goldenclad prospect sit on top of an already defined 3.1Moz resource at the Spur project in New South Wales, as reported on 5 November 2026, which suggests upside for both grade and near‑surface ounces beyond the current JORC envelope.

    With Waratah Minerals having secured $50 million in equity commitments to fund over 100,000m of drilling at Spur (19 November 2026), results like 10m @ 12.18g/t from 49m depth indicate that a meaningful portion of that budget can now be targeted at rapidly converting shallow discoveries into resource additions.

    Our database shows multiple recent Spur‑related pieces describing mineralisation continuity along a 6km corridor between the main Spur deposit and the historic Essex Mine (2 November 2026), so Goldenclad’s high‑grade hits strengthen the case for a district‑scale gold system rather than a single isolated orebody.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 2 hours ago

    Jiangxi Siton at bauma CHINA 2026: underground fleet takeaways for mine engineers

    Jiangxi Siton is using bauma CHINA 2026 to showcase six underground models, signalling its push beyond China where it already supplies Latin American and Central Asian mines. The company, a key supplier to Jiangxi Copper and other major Chinese mining houses, is positioning its drilling, loading and haulage equipment for both hard rock and coal operations. For engineers, the message is that Chinese OEMs with proven export fleets are now credible alternatives to established Western brands for new underground project tenders and fleet renewals.

    Price floors for rare earth projects beyond China: financing lens for engineers
    Mining
    about 4 hours ago

    Price floors for rare earth projects beyond China: financing lens for engineers

    Western buyers are paying extreme premiums for rare earth oxides as China’s export controls bite, with high‑purity yttrium oxide at about US$1,650/kg in North America versus roughly US$9/kg in China and dysprosium oxide in Europe at about US$4,875/kg, around 22 times the Chinese price. Sprott’s Paul Wong and Jacob White argue that long‑term offtake contracts with price floors, such as MP Materials’ 10‑year US DoD deal at US$110/kg for NdPr and Lynas’ March 2025 floor agreement with JARE, are becoming critical to debt financing new separation and refining capacity. Equity markets remain weak, with the Sprott Rare Earths Ex‑China ETF down 30% since 30 September despite over US$100 million of net inflows, pushing developers towards structured contracts and, in cases like South Africa’s Steenkampskraal, staged lab‑to‑pilot separation trials with partners such as Remedy Metals.

    Kazatomprom bribery probe: operational and project risk notes for mine planners
    Mining
    about 5 hours ago

    Kazatomprom bribery probe: operational and project risk notes for mine planners

    Kazakhstan’s anti-corruption service has detained Kazatomprom operations chief Kuanysh Omarbekov in a widening bribery probe linked to former leaders of sovereign wealth fund Samruk-Kazyna, which controls 63% of the world’s largest uranium miner and managed $88 billion in assets at end-2025. Kazatomprom, whose operations are expected to yield 27,500–29,000 tonnes of uranium in 2026 (14,500–15,500 tonnes attributable), has removed Omarbekov and chief commercial officer Vladislav Baiguzhin, while insisting production and commercial teams remain intact. The investigation comes as Kazatomprom’s global depositary receipts fell nearly 10% in London to $49.80, and as Canadian partner Cameco advances 2026 deliveries from the Inkai mine totalling 10.4 million lb. U3O8.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.