Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects

    Tivan’s Speewah fluorite project: EPA review implications for mine design

    November 23, 2026|

    Reviewed by Tom Sullivan

    Tivan’s Speewah fluorite project: EPA review implications for mine design

    First reported on Australian Mining

    30 Second Briefing

    Tivan has lodged the environmental review document for its Speewah fluorite project in Western Australia with the state Environmental Protection Authority after more than three years of environmental studies, field surveys and technical assessments. The referral is a key step in the approvals pathway for the proposed fluorite mining operation, which targets development of what Tivan has previously described as a large-scale critical minerals project. Geotechnical and mine planners should expect detailed scrutiny of baseline ecology, groundwater interactions and waste management design as the EPA assessment progresses.

    Technical Brief

    • Environmental review document scope implies integrated assessment of pit design, waste landforms and processing footprint.
    • Fluorite focus points to potential acid generation and fluoride mobility checks in waste rock characterisation.
    • EPA referral stage will drive detailed mine water balance, including pit inflows and process water demand.
    • Tailings and waste dumps will face scrutiny on seepage control, liner requirements and long-term geochemical stability.
    • Location in Western Australia triggers alignment with state guidelines on mine closure, rehabilitation criteria and residual risk.
    • Similar fluorite or critical mineral projects in WA can expect comparable depth of pre-approval environmental and hydrogeological work.

    Our Take

    Speewah is one of only a handful of fluorite‑tagged projects in our mining database, so Tivan’s Western Australia footprint here sits alongside its Northern Territory fluorite work at Sandover, giving the company a multi‑jurisdictional position in this niche commodity.

    The recent appointment of ICA Natural Resources as debt adviser for Speewah suggests Tivan is trying to run financing and Western Australia EPA approvals in parallel, which typically shortens the window between environmental sign‑off and a construction decision for projects of this scale.

    With Tivan also advancing a $50 million incorporated JV at the Molyhil tungsten project, the move to lodge an environmental review for the Speewah fluorite project indicates a strategy of building a portfolio of critical and near‑critical minerals assets in both Western Australia and the Northern Territory rather than relying on a single flagship mine.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 2 hours ago

    Jiangxi Siton at bauma CHINA 2026: underground fleet takeaways for mine engineers

    Jiangxi Siton is using bauma CHINA 2026 to showcase six underground models, signalling its push beyond China where it already supplies Latin American and Central Asian mines. The company, a key supplier to Jiangxi Copper and other major Chinese mining houses, is positioning its drilling, loading and haulage equipment for both hard rock and coal operations. For engineers, the message is that Chinese OEMs with proven export fleets are now credible alternatives to established Western brands for new underground project tenders and fleet renewals.

    Price floors for rare earth projects beyond China: financing lens for engineers
    Mining
    about 4 hours ago

    Price floors for rare earth projects beyond China: financing lens for engineers

    Western buyers are paying extreme premiums for rare earth oxides as China’s export controls bite, with high‑purity yttrium oxide at about US$1,650/kg in North America versus roughly US$9/kg in China and dysprosium oxide in Europe at about US$4,875/kg, around 22 times the Chinese price. Sprott’s Paul Wong and Jacob White argue that long‑term offtake contracts with price floors, such as MP Materials’ 10‑year US DoD deal at US$110/kg for NdPr and Lynas’ March 2025 floor agreement with JARE, are becoming critical to debt financing new separation and refining capacity. Equity markets remain weak, with the Sprott Rare Earths Ex‑China ETF down 30% since 30 September despite over US$100 million of net inflows, pushing developers towards structured contracts and, in cases like South Africa’s Steenkampskraal, staged lab‑to‑pilot separation trials with partners such as Remedy Metals.

    Kazatomprom bribery probe: operational and project risk notes for mine planners
    Mining
    about 5 hours ago

    Kazatomprom bribery probe: operational and project risk notes for mine planners

    Kazakhstan’s anti-corruption service has detained Kazatomprom operations chief Kuanysh Omarbekov in a widening bribery probe linked to former leaders of sovereign wealth fund Samruk-Kazyna, which controls 63% of the world’s largest uranium miner and managed $88 billion in assets at end-2025. Kazatomprom, whose operations are expected to yield 27,500–29,000 tonnes of uranium in 2026 (14,500–15,500 tonnes attributable), has removed Omarbekov and chief commercial officer Vladislav Baiguzhin, while insisting production and commercial teams remain intact. The investigation comes as Kazatomprom’s global depositary receipts fell nearly 10% in London to $49.80, and as Canadian partner Cameco advances 2026 deliveries from the Inkai mine totalling 10.4 million lb. U3O8.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.