Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects

    Laramide’s $741M Westmoreland uranium project: economics and risk notes for mine planners

    July 23, 2026|

    Reviewed by Joe Ashwell

    Laramide’s $741M Westmoreland uranium project: economics and risk notes for mine planners

    First reported on MINING.com

    30 Second Briefing

    An updated preliminary economic assessment values Laramide Resources’ Westmoreland uranium project in Queensland at about $741 million after tax, assuming a long-term uranium price of $90/lb U₃O₈, a 7.5% discount rate, 33% IRR and 2.5-year payback, with initial capital of $456 million plus an $84 million contingency. The 11-year open-pit operation is designed to process 2.9 Mtpa through a conventional mill and leach circuit, producing 4.9 million lb U₃O₈ per year at projected 95% recovery and cash costs of $32.40/lb, drawing on 27.8 Mt indicated at 770 ppm U and 11.8 Mt inferred at 680 ppm. Development remains contingent on Queensland lifting its uranium mining ban, with power options under review including hybrid diesel, solar and battery storage.

    Technical Brief

    • Updated PEA replaces a 2016 assessment that used a 10% discount rate and US$65/lb uranium price.
    • Life‑of‑mine production totals 47.9 million lb U₃O₈, implying modest ramp‑down or grade variation versus annual average.
    • Current mineral inventory comprises 27.8 Mt indicated at 770 ppm U and 11.8 Mt inferred at 680 ppm U, with no reserves declared.
    • Defined resources equate to 48.1 Mlb U₃O₈ indicated and 17.7 Mlb inferred, all within Queensland’s Westmoreland property.
    • PEA economics exclude any upside from satellite uranium targets, gold or rare earth mineralisation identified in the broader district.
    • Project advancement is constrained by Queensland’s longstanding uranium mining ban, despite Laramide’s readiness to file a mining lease application.
    • Australia’s current operating uranium mines are confined to South Australia and the Northern Territory, while nuclear power remains banned nationally.
    • India’s target of 100 GW nuclear capacity by 2047, and a new Australia–India uranium supply deal, frame potential long‑term demand for projects like Westmoreland.

    Our Take

    Laramide Resources’ pivot to the Westmoreland uranium property follows its earlier decision to walk away from a Kazakhstan option after Kazatomprom was granted priority rights in new uranium JVs, suggesting the company is refocusing on jurisdictions like Australia and Canada where it can retain greater project control.

    With uranium and uranium oxide featuring in 43 keyword-matched pieces in our database, Westmoreland’s projected cash operating cost of $32.4/lb positions it in a cost bracket that is likely competitive against many of the higher-cost uranium projects appearing in recent coverage.

    Sunrise Energy Metals’ work on a 120 tpa scandium oxide expansion train at Syerston in New South Wales indicates that critical-mineral by-product streams such as scandium and rare earths, also mentioned around Westmoreland, are becoming more central to project economics and offtake strategies in Australia.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 6 hours ago

    Glencore’s US$250m Cat order for Alumbrera: fleet renewal lens for mine planners

    Glencore has placed a US$250 million order with Finning’s South America business to supply more than 20 large Caterpillar mining trucks, ancillary equipment and technology support for the planned 2026 restart of the Alumbrera copper mine in Argentina. The package, disclosed in Finning’s Q1 2026 results, centres on fleet renewal and digital support rather than life-extension of legacy units. For mine planners and maintenance teams, the scale and timing signal a shift towards a modernised, OEM-supported truck fleet ahead of full production ramp-up.

    MAX Power’s Lawson hydrogen project expansion: scale and infrastructure lens for engineers
    Mining
    1 day ago

    MAX Power’s Lawson hydrogen project expansion: scale and infrastructure lens for engineers

    MAX Power Mining has secured an additional 155,125 acres (628 sq. km) of permits contiguous with its 1,224 sq. km Lawson natural hydrogen project in south-central Saskatchewan, creating the newly named Aurora project on a basement-controlled structural play along the Paleoproterozoic–Archean contact of the Sask Craton. The company has now accumulated 660,263 acres (2,672 sq. km) of provincial permits across the Genesis Trend while running a multi-well commercial validation drill programme at Lawson targeting large-scale natural hydrogen. An MOU with the City of Moose Jaw links potential hydrogen development to a nearby heavy industrial and major data centre corridor, signalling early focus on local offtake and infrastructure integration.

    American Mineral Resources’ diversified portfolio: capex and jurisdiction risk lens
    Mining
    1 day ago

    American Mineral Resources’ diversified portfolio: capex and jurisdiction risk lens

    American Mineral Resources is assembling a seven-jurisdiction portfolio across Quebec, British Columbia, Yukon, Chile, New Zealand, Western Australia and Tanzania, with its Piscau North polymetallic project in Quebec earmarked for a separate Canadian Securities Exchange listing, as it targets a Nasdaq uplist within 12 months via the OTCQB. CEO Ryan Cunningham is prioritising projects with existing permits or modest capex and argues that jurisdictional risk now rivals grade, citing Quebec’s Gaspé oil drilling ban as a warning. He also points to Canada’s flow-through share regime as a key financing advantage over US markets still fixated on AI and tech.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.