Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Op-Ed

    Government-fuelled financial bubble: gold price risks and signals for project teams

    September 16, 2026|

    Reviewed by Joe Ashwell

    Government-fuelled financial bubble: gold price risks and signals for project teams

    First reported on MINING.com

    30 Second Briefing

    Financial author and forecaster Harry Dent blames the latest asset bubble on unprecedented US government money-printing, warning that another “couple trillion” dollars of stimulus will be less effective because investors have already seen repeated crisis rescues. He labels gold’s surge from about $1,600 to roughly $5,600 in three years as “the fastest, most extreme bubble in history”, far above its long-term trend. Dent expects a severe deflationary downturn would drag gold down alongside commodities and equities, though with smaller percentage losses.

    Technical Brief

    • Dent attributes the current bubble specifically to US federal “printed money” rather than private credit expansion.
    • He characterises the policy response as repeated crisis rescues via trillions in fiscal and monetary stimulus.
    • Future interventions of “another couple trillion” dollars are expected to face reduced market credibility and impact.
    • Anticipated loss of confidence is framed as investors explicitly rejecting “we’ve seen this story before”.
    • Dent warns that a sharper, less controllable crash becomes likely if markets no longer trust new stimulus.
    • He links extreme asset price deviations from long-term trend to symmetric overshoot on the downside in corrections.
    • Gold’s behaviour is treated as correlated with commodities and equities during deflationary shocks, not a pure hedge.

    Our Take

    Dent’s suggested move in gold from about $1,600 to $5,600/oz over three years lines up with other MINING.COM coverage where a January peak near $5,589/oz was followed by a sharp correction, underscoring how policy‑driven surges can quickly unwind and stress leveraged gold producers.

    This Policy-tagged op-ed sits within a cluster of 120 policy stories and over 400 gold- and aluminium-linked pieces in our database, signalling that macro and monetary narratives are now as central to coverage of US- and Venezuela-exposed gold assets as mine-level fundamentals.

    The reference to ‘another couple trillion’ dollars of US stimulus echoes recent pieces tying AI- and tech-driven equity volatility (e.g. the Nvidia valuation swing) to metals such as gold and aluminium, suggesting miners and traders like Mercuria and Heeney Capital must now price policy risk alongside demand from new-economy sectors.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Smarter risk-sharing for UK ageing infrastructure: key lessons for project engineers
    Policy
    2 days ago

    Smarter risk-sharing for UK ageing infrastructure: key lessons for project engineers

    Improved public–private collaboration, “smarter” financial risk sharing and better asset data are being urged by a new Lloyds Banking Group report to upgrade the UK’s ageing, climate-exposed infrastructure. The report calls for clearer allocation of construction, demand and climate risks between government, institutional investors and asset owners, moving beyond traditional PFI-style models. For engineers, this points to stronger requirements for whole-life performance data, climate stress testing of assets and more transparent condition information to unlock private capital for renewals and resilience upgrades.

    Government’s 10% biodiversity net gain ceiling: key planning risks for engineers
    Policy
    2 days ago

    Government’s 10% biodiversity net gain ceiling: key planning risks for engineers

    Environmental charity the Environmental Law Foundation has warned it may launch a judicial review against the government’s new biodiversity net gain (BNG) regime, arguing that the statutory 10% uplift risks being treated as a de facto cap rather than a minimum. The challenge would focus on how planning authorities apply the Environment Act 2021 BNG provisions and Natural England’s statutory metric in development consents. For civil and geotechnical schemes, this could affect habitat creation areas, earthworks footprints and off-site BNG land agreements already being negotiated.

    Carbon in procurement: practical tender implications for project engineers
    Policy
    3 days ago

    Carbon in procurement: practical tender implications for project engineers

    Carbon-focused procurement is emerging as a practical lever for low-carbon infrastructure, with clients increasingly writing embodied and whole-life carbon limits directly into tender documents alongside cost and programme. Contracting authorities are starting to require Environmental Product Declarations, PAS 2080-aligned carbon management plans and optioneering that compares low-clinker cements, recycled steel and alternative pavement designs on a carbon-per-functional-unit basis. For engineers and contractors, this shifts bid strategy towards quantifiable carbon performance, verifiable data and early supplier engagement rather than purely lowest capital cost.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy