Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Global mineral race and 2026 IMARC: policy and funding takeaways for projects

    September 9, 2026|

    Reviewed by Tom Sullivan

    Global mineral race and 2026 IMARC: policy and funding takeaways for projects

    First reported on Australian Mining

    30 Second Briefing

    A looming “space race” for critical minerals is set to accelerate state-backed mining investment, with International Council on Mining and Metals chief executive Rohitesh Dhawan arguing that geopolitical competition could rapidly expand permitting, infrastructure funding and offtake guarantees. The 2026 International Mining and Resources Conference (IMARC) in Melbourne is being framed as a test of whether governments will move beyond rhetoric to concrete policy support, including streamlined approvals and public–private financing for new copper, nickel and rare earths projects.

    Technical Brief

    • Rohitesh Dhawan, CEO of the International Council on Mining and Metals, is driving the “space race” framing.

    Our Take

    The International Council on Mining and Metals (ICMM) features in several recent policy pieces in our database, signalling that its positions are increasingly shaping how governments frame project-approval pathways rather than just voluntary industry standards.

    Linking this IMARC 2026 discussion in Australia with the 2025–2026 coverage of Antofagasta and Newmont via ICMM suggests that copper- and gold-focused majors are likely to be key voices in any ‘mineral race’ debates over permitting speed versus ESG safeguards.

    With 121 Policy stories and 2386 tag-matched ‘Projects’ pieces in our coverage, Australia stands out as one of the most frequently cited jurisdictions where digitalisation themes flagged by Australian Mining are converging with high-level ICMM policy messaging on future project pipelines.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Smarter risk-sharing for UK ageing infrastructure: key lessons for project engineers
    Policy
    2 days ago

    Smarter risk-sharing for UK ageing infrastructure: key lessons for project engineers

    Improved public–private collaboration, “smarter” financial risk sharing and better asset data are being urged by a new Lloyds Banking Group report to upgrade the UK’s ageing, climate-exposed infrastructure. The report calls for clearer allocation of construction, demand and climate risks between government, institutional investors and asset owners, moving beyond traditional PFI-style models. For engineers, this points to stronger requirements for whole-life performance data, climate stress testing of assets and more transparent condition information to unlock private capital for renewals and resilience upgrades.

    Government’s 10% biodiversity net gain ceiling: key planning risks for engineers
    Policy
    2 days ago

    Government’s 10% biodiversity net gain ceiling: key planning risks for engineers

    Environmental charity the Environmental Law Foundation has warned it may launch a judicial review against the government’s new biodiversity net gain (BNG) regime, arguing that the statutory 10% uplift risks being treated as a de facto cap rather than a minimum. The challenge would focus on how planning authorities apply the Environment Act 2021 BNG provisions and Natural England’s statutory metric in development consents. For civil and geotechnical schemes, this could affect habitat creation areas, earthworks footprints and off-site BNG land agreements already being negotiated.

    Carbon in procurement: practical tender implications for project engineers
    Policy
    3 days ago

    Carbon in procurement: practical tender implications for project engineers

    Carbon-focused procurement is emerging as a practical lever for low-carbon infrastructure, with clients increasingly writing embodied and whole-life carbon limits directly into tender documents alongside cost and programme. Contracting authorities are starting to require Environmental Product Declarations, PAS 2080-aligned carbon management plans and optioneering that compares low-clinker cements, recycled steel and alternative pavement designs on a carbon-per-functional-unit basis. For engineers and contractors, this shifts bid strategy towards quantifiable carbon performance, verifiable data and early supplier engagement rather than purely lowest capital cost.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy