Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects

    Gateway Panakin fresh-rock gold hit: targeting depth potential for mine planners

    November 23, 2026|

    Reviewed by Joe Ashwell

    Gateway Panakin fresh-rock gold hit: targeting depth potential for mine planners

    First reported on Australian Mining

    30 Second Briefing

    Gateway Mining has intersected fresh-rock gold grading 1m at 16.5g/t from recent aircore drilling at the Panakin prospect within its Yandal gold project in Western Australia. The mineralisation occurs beneath transported cover, indicating untested fresh-rock potential beyond the existing regolith anomalies that have guided earlier programmes. For explorers and resource modellers, the result suggests scope for higher-grade lodes at depth and justifies follow-up RC or diamond drilling to define geometry, continuity and potential open-pit or underground development scenarios.

    Technical Brief

    • Aircore drilling was used as the initial penetration method into fresh rock at Panakin.
    • Mineralisation confirmation in fresh rock materially upgrades exploration risk profile compared with earlier regolith-focused anomalies.
    • Fresh-rock intercepts beneath transported cover imply conventional surface geochemistry will under-represent true anomaly footprint.
    • Structural and lithological controls on the fresh-rock lode remain undefined, necessitating oriented RC or diamond follow-up.
    • Discovery scale is still unconstrained, with only early-phase aircore spacing and limited strike coverage completed.
    • For similar greenstone belts, such cover-hosted fresh-rock hits often precede resource-definition drilling campaigns.

    Our Take

    Gateway Mining’s fresh-rock hit at the Panakin prospect follows the recent fresh-rock discovery at Cowza within the same Yandal gold project, suggesting the company is progressively de-risking primary mineralisation rather than relying on near-surface oxide ounces.

    The standout 1m at 16.5g/t gold intersection at Yandal sits alongside Gateway’s work on the 3km-long Pewy target and board reshaping flagged in October 2026, indicating the company is building a pipeline of higher-grade targets that could support a future resource upgrade or development study sequence in Western Australia.

    Within our Mining projects coverage, Gateway Mining now appears in multiple gold exploration pieces across both Yandal and Glenburgh South, signalling that it is emerging as one of the more active junior explorers in Western Australia’s gold space rather than a single-asset story.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 2 hours ago

    Jiangxi Siton at bauma CHINA 2026: underground fleet takeaways for mine engineers

    Jiangxi Siton is using bauma CHINA 2026 to showcase six underground models, signalling its push beyond China where it already supplies Latin American and Central Asian mines. The company, a key supplier to Jiangxi Copper and other major Chinese mining houses, is positioning its drilling, loading and haulage equipment for both hard rock and coal operations. For engineers, the message is that Chinese OEMs with proven export fleets are now credible alternatives to established Western brands for new underground project tenders and fleet renewals.

    Price floors for rare earth projects beyond China: financing lens for engineers
    Mining
    about 4 hours ago

    Price floors for rare earth projects beyond China: financing lens for engineers

    Western buyers are paying extreme premiums for rare earth oxides as China’s export controls bite, with high‑purity yttrium oxide at about US$1,650/kg in North America versus roughly US$9/kg in China and dysprosium oxide in Europe at about US$4,875/kg, around 22 times the Chinese price. Sprott’s Paul Wong and Jacob White argue that long‑term offtake contracts with price floors, such as MP Materials’ 10‑year US DoD deal at US$110/kg for NdPr and Lynas’ March 2025 floor agreement with JARE, are becoming critical to debt financing new separation and refining capacity. Equity markets remain weak, with the Sprott Rare Earths Ex‑China ETF down 30% since 30 September despite over US$100 million of net inflows, pushing developers towards structured contracts and, in cases like South Africa’s Steenkampskraal, staged lab‑to‑pilot separation trials with partners such as Remedy Metals.

    Kazatomprom bribery probe: operational and project risk notes for mine planners
    Mining
    about 5 hours ago

    Kazatomprom bribery probe: operational and project risk notes for mine planners

    Kazakhstan’s anti-corruption service has detained Kazatomprom operations chief Kuanysh Omarbekov in a widening bribery probe linked to former leaders of sovereign wealth fund Samruk-Kazyna, which controls 63% of the world’s largest uranium miner and managed $88 billion in assets at end-2025. Kazatomprom, whose operations are expected to yield 27,500–29,000 tonnes of uranium in 2026 (14,500–15,500 tonnes attributable), has removed Omarbekov and chief commercial officer Vladislav Baiguzhin, while insisting production and commercial teams remain intact. The investigation comes as Kazatomprom’s global depositary receipts fell nearly 10% in London to $49.80, and as Canadian partner Cameco advances 2026 deliveries from the Inkai mine totalling 10.4 million lb. U3O8.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.