Geomechanics.io

  • Free Tools
Sign UpLog In
AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Copper price nears record as Shanghai, London stocks drain: supply risks for mine planners

    September 22, 2026|

    Reviewed by Tom Sullivan

    Copper price nears record as Shanghai, London stocks drain: supply risks for mine planners

    First reported on MINING.com

    30 Second Briefing

    Copper futures on Comex climbed 1.1% to $6.8370/lb (about $15,070/t), within 1% of their record settlement, as SHFE warehouse stocks fell 70% since June to 43,900 t and cash copper on the LME flipped into a $62/t backwardation, signalling acute near-term tightness. Cancelled LME warrants have risen to 122,150 t, leaving only 133,725 t available, while Comex now holds 696,204 t, about 69% of exchange-monitored copper, with New Orleans storage near full and another 100,000 t inbound. Supply risks remain elevated, with Grasberg and Kamoa-Kakula disruptions removing roughly 600,000 t from 2026 mine output and Sprott warning global production could contract for the first time since 2017.

    Technical Brief

    • December Comex copper hit an intraday high of $6.8710/lb before easing slightly.
    • LME three‑month copper traded at $14,766/t, keeping New York’s premium above $300/t.
    • Shanghai’s most‑traded copper contract reached 111,320 yuan/t (about $16,616/t), tracking Western price strength.
    • Yangshan import premium for delivered copper closed last week at its highest level in nearly four years.
    • Chinese buyers accelerated restocking ahead of market closures from 25–27 September and 1–7 October.
    • Cash‑to‑three‑month LME spread moved from an $86/t discount a week ago to a $62/t premium.
    • Freeport‑McMoRan’s Grasberg and Ivanhoe’s Kamoa‑Kakula issues have already removed 600,000 t from expected 2026 mine supply.
    • First Quantum’s share price jump followed a UK patent grant for its trolley‑assist haulage system, signalling traction for diesel‑displacement technologies.

    Our Take

    Our recent 18 September copper supply piece flagged a 1.1% year‑on‑year drop in mined output and specific losses at Grasberg and Kamoa‑Kakula, which helps explain why today’s near‑record Comex levels are being driven more by structural mine underperformance than by short‑term speculative flows.

    With Comex now holding about 69% of all exchange‑monitored copper and New York prices running a roughly $300/t premium over the LME, physical traders and smelters tied to London or Shanghai benchmarks face growing basis risk when hedging Latin American and African production from assets like Escondida and Kamoa‑Kakula.

    Across our copper coverage since mid‑August, repeated references to collapsing treatment charges and shrinking cathode inventories suggest integrated players such as Freeport‑McMoRan, BHP and Antofagasta are better positioned than toll smelters to capture margin in a market where refined units, not ore, are the immediate bottleneck.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Gold price slides on strong dollar: planning implications for mine projects
    Mining
    about 15 hours ago

    Gold price slides on strong dollar: planning implications for mine projects

    Gold prices slipped to a one-week low as spot gold fell 0.4% to $4,271.16/oz in New York and December futures eased 0.3% to $4,306 amid a stronger US dollar and expectations of more hawkish US Federal Reserve rate moves. The dollar hit a two-month high and US 10-year Treasury yields hovered near a 20-year peak, sharply raising the opportunity cost of holding non-yielding bullion. Oil gained about 1% on stalled US–Iran talks over the war, while spot silver dropped 1.8% to $63.29/oz, platinum 0.2% to $1,746.44, and palladium rose 0.5% to $1,266.40.

    OceanaGold Waihi expansion: design, throughput and tailings notes for engineers
    Mining
    about 16 hours ago

    OceanaGold Waihi expansion: design, throughput and tailings notes for engineers

    OceanaGold is weighing a 50% expansion of its Waihi plant to 1.2 Mt/y after Wharekirauponga drilling returned standout intercepts including 6.3 m at 97.2 g/t Au from 481.5 m in the East Graben vein and 8.5 m at 41.5 g/t from 399 m. The move would enable concurrent feed from Martha Underground and Wharekirauponga post‑2032, building on a 2024 plan outlining 1.6 Moz over 15 years and an initial 4.1 Mt reserve at 9.2 g/t. Underground development is advancing, with the Waihi North decline now 350 m, first vent shaft under construction, staged commissioning of a new water treatment plant, and early works on a new tailings storage facility due in Q4.

    Kinross Gold output cut and higher AISC: operational drivers and FCF lens for mine teams
    Mining
    about 16 hours ago

    Kinross Gold output cut and higher AISC: operational drivers and FCF lens for mine teams

    Kinross Gold has cut its 2026–27 production outlook by about 8% to 1.84–1.86 million attributable gold-equivalent oz. a year and raised 2024 AISC guidance to $1,850–$1,900/oz after winter storms, copper-rich sulphide ore and poor recoveries at La Coipa in Chile, plus weaker mining rates, grades and recoveries at Round Mountain Phase S in Nevada. The company is stockpiling high-copper material, studying a new flotation circuit for deeper sulphide mineralisation that may overlie a copper porphyry system, and using a smaller shovel at Round Mountain to cut dilution. Despite the operational hit and a Q3 output cut to about 425,000 oz., Kinross has lifted its 2026 shareholder return target to 50% of free cash flow and has already returned about $800 million this year, mainly via $655 million in buybacks.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.