Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects

    Auric’s Munda gold restart 2027: drilling insights for mine planners and engineers

    September 24, 2026|

    Reviewed by Joe Ashwell

    Auric’s Munda gold restart 2027: drilling insights for mine planners and engineers

    First reported on Australian Mining

    30 Second Briefing

    Auric Mining has reported strong new drilling results at the Munda gold project near Widgiemooltha, WA, as it works towards restarting open-pit mining in 2027. Broad-spaced reverse circulation drilling is testing resource extensions beyond the current pit shell, while closer-spaced grade-control holes are refining ore boundaries within the planned open pit. Additional sterilisation drilling is being completed in proposed infrastructure corridors, with outcomes likely to influence final pit design, haul road alignment and plant or waste-dump siting.

    Technical Brief

    • Broad-spaced RC holes are stepping out from the current pit shell to test mineralisation continuity.
    • Closer-spaced RC drilling within the pit envelope is tightening ore–waste boundaries for short-term scheduling.
    • Sterilisation drilling lines are being advanced along proposed infrastructure corridors to de-risk plant and haulage layouts.
    • Drilling data will feed into an updated resource model, informing revised pit optimisation and pushback design.
    • Results are expected to influence waste-dump footprint selection and sequencing of initial cutbacks.
    • Integration of exploration, grade-control and sterilisation datasets should reduce rework in future mine planning cycles.

    Our Take

    Auric Mining’s earlier report of $10.8 million in revenue from its first Munda gold campaign near Widgiemooltha suggests the 2027 restart is being planned off a proven cash-generating base rather than a greenfield assumption, which typically improves access to contract mining and toll-treatment options in Western Australia.

    In our database of Australian gold coverage, Auric Mining appears alongside juniors like Legacy Minerals and Kalamazoo Resources that are also advancing projects, signalling that Munda’s 2027 timeline will be competing for drilling crews, assay lab capacity and, potentially, mill slots in a crowded junior gold pipeline.

    With over 2000 keyword-matched pieces mentioning gold and AI or artificial intelligence, Western Australian gold operators such as Auric Mining are increasingly positioned to tap data-driven targeting and grade-control tools, which could be material for a restart scenario where cut-off grade optimisation is critical to early cash flow.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Gold price slides on strong dollar: planning implications for mine projects
    Mining
    about 14 hours ago

    Gold price slides on strong dollar: planning implications for mine projects

    Gold prices slipped to a one-week low as spot gold fell 0.4% to $4,271.16/oz in New York and December futures eased 0.3% to $4,306 amid a stronger US dollar and expectations of more hawkish US Federal Reserve rate moves. The dollar hit a two-month high and US 10-year Treasury yields hovered near a 20-year peak, sharply raising the opportunity cost of holding non-yielding bullion. Oil gained about 1% on stalled US–Iran talks over the war, while spot silver dropped 1.8% to $63.29/oz, platinum 0.2% to $1,746.44, and palladium rose 0.5% to $1,266.40.

    OceanaGold Waihi expansion: design, throughput and tailings notes for engineers
    Mining
    about 15 hours ago

    OceanaGold Waihi expansion: design, throughput and tailings notes for engineers

    OceanaGold is weighing a 50% expansion of its Waihi plant to 1.2 Mt/y after Wharekirauponga drilling returned standout intercepts including 6.3 m at 97.2 g/t Au from 481.5 m in the East Graben vein and 8.5 m at 41.5 g/t from 399 m. The move would enable concurrent feed from Martha Underground and Wharekirauponga post‑2032, building on a 2024 plan outlining 1.6 Moz over 15 years and an initial 4.1 Mt reserve at 9.2 g/t. Underground development is advancing, with the Waihi North decline now 350 m, first vent shaft under construction, staged commissioning of a new water treatment plant, and early works on a new tailings storage facility due in Q4.

    Kinross Gold output cut and higher AISC: operational drivers and FCF lens for mine teams
    Mining
    about 16 hours ago

    Kinross Gold output cut and higher AISC: operational drivers and FCF lens for mine teams

    Kinross Gold has cut its 2026–27 production outlook by about 8% to 1.84–1.86 million attributable gold-equivalent oz. a year and raised 2024 AISC guidance to $1,850–$1,900/oz after winter storms, copper-rich sulphide ore and poor recoveries at La Coipa in Chile, plus weaker mining rates, grades and recoveries at Round Mountain Phase S in Nevada. The company is stockpiling high-copper material, studying a new flotation circuit for deeper sulphide mineralisation that may overlie a copper porphyry system, and using a smaller shovel at Round Mountain to cut dilution. Despite the operational hit and a Q3 output cut to about 425,000 oz., Kinross has lifted its 2026 shareholder return target to 50% of free cash flow and has already returned about $800 million this year, mainly via $655 million in buybacks.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.